Laserfiche WebLink
r� h <br /> w�.�. III -•�{ <br /> h\a <br /> Position the top edge of the template 1/2" Trace and continue using a lumber crayon to the <br /> above the 1st course of shingle as shown. bottom of the 2nd course. Cut along lines and <br /> remove shingles. <br /> STEP 2 STEP 3 <br /> RECCOMENDED <br /> LOCATION FOR <br /> CONDUIT ENTRY <br /> INTO ROOF <br /> RAISED AREA IN <br /> MOLDED BASE <br /> Remove any roofing nails beneath the 1st, 2nd, or DRILL PILOT HOLE <br /> 31d course of tile that obstructs the position of Slide RJ-1 Junction box into place where you <br /> the roof flashing. cut shingle template.The image above shows <br /> STEP 4 where you will drill in the next step <br /> STEP 5 <br /> www.soltection.com Soltection 11J-1 Installation Manual Page 8 <br />