Laserfiche WebLink
I <br /> • <br /> Plan Review <br /> Modular Home Set-ups and Aluminum Packages <br /> 1)All-property markers shall be exposed and. clearly marked at time of first <br /> inspection. <br /> 2) All setbacks shall be.met. <br /> 3)All garages shall comply with section 309.2 (Fire separation ): <br /> 4)Access shall be made available at time of inspection. <br /> 5) Manufacture specification manual, approved plans and permit shall be available at <br /> time of inspection. <br /> 6) No electric, plumbing, mechanical or framing is to be covered without inspection and <br /> approval .first. <br /> 1) R.O.W. Use permit required for driveways on public streets. <br /> 8)At least 10' separation between other units in unplatted locations. <br /> 9) All work shall comply with the F.B.C; 61 edition and the 2014 N.E.C. <br /> 10) Clean-outs shall be installed per code. <br /> R.O.W. - Right Of Way F.B.C. - Florida Building Code <br /> N.E.C. - National Electric Code <br />