Laserfiche WebLink
INSULATION <br /> ------------------------------------ <br /> SLOPE 0"-2%"per ft* <br /> MATERIALS per 100 sq ft <br /> INSULATION <br /> _ PARADIENE 30 FIR TG 112 lb <br /> Contact Siplast for higher slope <br /> - requirements. <br /> --- n.t.s. <br /> Specificatioh: 2030 IT <br /> Requirements and recommendations detailed in the Siplast catalog and Siplast long form specifications shall <br /> apply in addition to the following recommendations and specifications. <br /> Application <br /> 1. Install insulation panels according to manufacturer's recommendations and FM Global requirements,if applicable. <br /> The edges of ins,:Iation panels should be in moderate contact without forcing and cut to fit neatly against adjoining <br /> surfaces. The ins!elation layer should present a smooth surface to accept the roof membrane. <br /> 2. Beginning at the low point of the roof,fully torch one ply of the Paradiene 20 TG to the insulation surface,lapping <br /> sides and ends a minimum of 3 inches. Offset end laps a minimum of 3 feet. <br /> 3. Beginning again at the Icw point of the roof,fully torch one ply of Paradiene 30 FIR TG to the Paradiene 20 TG <br /> surface lapping sides and ends a minimum of 3 inches. Offset end laps a minimum of 3 feet. Stagger laps <br /> between plies. <br /> Note: Torch prime all granule surfaces to be lapped by adjoining sheets. <br /> Caution: Sip!ast r,-,commends that all practices pertaining to NRCA CERTA guidelines be followed when torching <br /> methods are employed. This includes performing a fire watch following any torch applications. Always <br /> have approved fire-extinguishing equipment nearby. <br /> Ref.#-P20-tg P30-tg Rigid <br /> Date:11.2.09 <br /> sl�asg` 1000 East Rochelle Boulevard Irving,Texas 76062 (800) 922-8800 FAX(469)996-2206 In <br /> An(copal Group Company <br />