My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21746
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 11:18:47 AM
Creation date
3/24/2021 11:18:46 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
19-21746
Building Department - Name
EVANS,MARILYN
Address
6310 SILVER OAKS DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order <br /> Envirbnmental Contractors 9/12/2019 Summary: SYSTEM C/O <br /> 10221 Hwy 301 <br /> Dade City FI 33525 Reference#: 9714-130 <br /> (352)567-5515 Tech: SHAWN <br /> Bill To: Job Name:. . <br /> Marilyn E. Evans Marilyn E. Evans <br /> 6310 Silver Oaks Dr. 6310 Silver Oaks Dr. <br /> Zephyrhills, FL 33542 Zephyrhills, FL 33542 <br /> (813)783-2922 H (813)780-1467 SHARON (813)783-2922 H (813)780-1467 SHARON <br /> Description of Work <br /> INSTALL 3 Ton , Heat Pump 14 SEER, R-410, BRYANT/CARRIER Split System VGF,with 5 KW heat strips, <br /> new digital thermostat, PERMIT $6250.00 ARI #9662283 <br /> 115271A BRYANT 3 Ton Ht. Pump-14 SEER-VGF-AHU <br /> Model#214DNA036000 <br /> CARRIER Air Handier <br /> Model#FB4CNP036L00 <br /> • PERM FILTER+SISTER=ALICE MARONI 3355+MR E DEC+ <br /> • 4/08-3T FRIG HP SS-R-410 & 10 YR LAB WARR-R1 78705 +SILVER OAKS+4-26-21 <br /> Other Subtotal Total <br /> 6250.00 6250.00 $6,250.00 <br /> All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or <br /> deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above <br /> the estimate. All agreements contingent upon delays beyond our control. Purchaser agrees to pay all costs of collection, including attorney's fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.