My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21807
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2021 8:11:39 AM
Creation date
3/24/2021 11:23:17 AM
Metadata
Fields
Template:
Building Department
Company Name
SLEEPY HOLLOW MOBILE HOME SUBDIVISION
Building Department - Doc Type
Permit
Permit #
19-21807
Building Department - Name
SLEEPY HOLLOW MOBILE (DUKE RICH)
Address
38619 LANSING AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J TRINITY1 ERA <br /> 5.4 For existing substrates, the AHJ may require fasteners be tested in the existing substrate for withdrawal <br /> resistance. A qualified design professional shall review the data for comparison to the minimum requirements <br /> for the system. <br /> 5.5 All products in the wall assembly shall have QA audit in accordance with the F.A.C. Rule 61G20-3. <br /> 6. INSTALLATION: <br /> 6.1 Norandex Vinyl Siding Systems shall be installed in accordance with ASTM D 4756'and recommendations of <br /> the Vinyl Siding Institute",subject to the Limitations/Conditions of Use noted in section 5. <br /> 6.1.1 Unless otherwise noted, fasteners for vinyl siding are limited to min. 1%" long (min. %-inch penetration) x <br /> 0.125"shank diameter x minimum 3/8" head diameter galvanized roofing nails. <br /> 6.1.2 Unless otherwise noted nails shall engage the stud framing members. <br /> 7. . BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of <br /> this product. <br /> 8. MANUFACTURING PLANTS: <br /> Claremont, NC <br /> 9. QUALITY ASSURANCE ENTITY: <br /> Architectural Testing(QUA1844); (717)764-7700;www.archtest.com/vsi <br /> -THE TWO(2)-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT- <br /> D4756-15,Standard Practice for Installation of Rigid Poly(Vinyl Chloride)(PVC)Siding and Soffit,©ASTM. <br /> Complete information on the Vinyl Siding Institute can be found at www.vinvisiding.org. <br /> Exterior Research and Design,LLC. Evaluation Report C13820.04.09-1-R3 <br /> Certificate of Authorization#9503 6"EDITION(2017)FBC NON-HVHZ EVALUATION FL12500-R3 <br /> Norandex Vinyl Siding Systems;(517)780-3185 Revision 3:09/26/2017 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.