Laserfiche WebLink
Project:LS Zephyrhills <br /> Title:New Facility <br /> Type:Office <br /> (WEA File:FL TAMPA_INTERNATIONAL AP.tm3) <br /> Building End Uses <br /> 1) Proposed 2) Baseline <br /> Total 254.20 390.00 <br /> $3,873 $5,990 <br /> ELECTRICITY(MBtu/kWh/$) 254.20 390.00 <br /> 74486 114306 <br /> $3,873 $5,990 <br /> AREA LIGHTS 60.70 164.50 <br /> 17781 48206 <br /> $925 $2,526 <br /> MISC EQUIPMT 149.30 149.30 <br /> 43747 43747 <br /> $2,275 $2,292 <br /> PUMPS& MISC 0.00 0.00 <br /> 8 12 <br /> $0 $1 <br /> SPACE COOL 30.80 36.90 <br /> 9032 10819 <br /> $470 $567 <br /> SPACE HEAT 0.10 0.60 <br /> 32 190 <br /> $2 $10 <br /> VENT FANS 13.30 38.70 <br /> 3886 11332 <br /> $202 $594 <br /> Credits Applied: None PASSES <br /> Passing Criteria=5091 <br /> Design (including any credits)=3873 <br /> Passing requires Proposed Building cost to be at'most 85% of <br /> Baseline cost.This Proposed Building is at 64.7% <br /> EnergyGauge Summit®Fla/Com-2017.TAM 2017-1.0 Compliant Software.Effective Date:Dec 31,2017 <br /> Florida Building Code,Sixth Edition(2017)-Energy Conservation IECC 2015-Total Building Performance Compliance Option <br /> 9/4/2019 Page 5 of 15 <br />