My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21985
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2021 8:12:30 AM
Creation date
3/24/2021 11:47:07 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
19-21985
Building Department - Name
SF ZEPHYR COMMONS OUTPARCELS LP
Address
38011 PRETTY POND RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSAL <br /> ENGINEERING SCIENCES <br /> Consultants In:Geotechnical Engineering•Environmental Sciences <br /> Geophysical Services•Construction Materials Testing•Threshold Inspection <br /> Building Inspection•Plan Review•Building Code Administration <br /> LIES CW1 Visual Inspection Report <br /> Project No: 0810.1900309.0000 Date: April 6, 2020 <br /> Project Name: Zephyr Commons Storage Client: Zephyr Self Storage <br /> Superintendent: Tony Price Company: J Raymond Const. <br /> Erection Company: Rapid Erectors Work Order No.: 118137 <br /> UES Inspector: Jay Nunes, Certified Welding Inspector;#16010811 <br /> Area Observed: 1st— Floor Fasteners; 2nd Floor Deck <br /> Structural Elements Visually Inspected: Project Completion Percentage; <br /> %Accepted %Rejected <br /> X Decking: X Srews X Lap Screws Pinned 50% 0% <br /> _ Joists Welds: Embed Beam Girder <br /> Joist Bridging Welds: <br /> _ Girder: Bolts Welds/Column' Welds/Embed <br /> X Beam Bolts: 2"d Floor/3rd Floor 100% <br /> X Perimeter Angle: 2"d Floor 50% 0% <br /> X Column Anchor Bolts: All Building Locations 100e/a <br /> RTU/Roof Openings: <br /> Other: <br /> Other: <br /> _ Other: <br /> Other: <br /> X Post Erection Inspection Re-inspection Final Inspection <br /> Remarks: <br /> 1) Deck Screws and Lap Screws,2nd Floor,Accepted 100% <br /> 2) Beam Bolts,All Building Locations;Accepted 100% <br /> 3) Perimeter Angle,2nd Floor;Accepted 100% <br /> 4) Column Anchor Bolts, All Building Locations;Accepted 100% <br /> 5) <br /> 6) <br /> 7) <br /> 8) <br /> 9) <br /> 10) <br /> 11) <br /> Field Copy to: Tony Price <br /> Note: Final Inspection issued upon 100%completion of all inspections. <br /> I <br /> All work inspected this day was found to be in conformance with the Contract Documents <br /> and the AWS D1.1-15 Structural Welding code. <br /> Excluding the deviations/deficiencies noted herein. ----_ . ---- <br /> 9802 Palm River Rd, Tampa, FL 33619 • (813)740-8506 61 .IayJ 16010611 <br /> V 1 <br /> I �Ws CMurm <br /> www.UniversalEngineering.com 1101,EXP•t"2 J <br />
The URL can be used to link to this page
Your browser does not support the video tag.