Laserfiche WebLink
FORM R405-2017 <br /> Florida Department of Business and Professional Regulations <br /> Residential Whole Building Performance hand Prescriptive Methods <br /> I <br /> ADDRESS* 3=1 601 Ave Permit Nurer: <br /> 2eptrathitts FL,33542 <br /> MANDATORY REQUIREMENTS See individual code sections fo full details. <br /> 401.3 Energy Performance Level(EPL)display card(Mandatory). The buildog offidal shag require that an energy Performance level(EPL) <br /> display card be completed and certified by the builder to be accurate and correct beC+final approval of the building for occupancy.Florida law <br /> (Section 553M86,Florida Statues]requires the EPL display card to be Included as an addendum to each sales oonbract for both.presold and <br /> nonpresold residential buildings.The EPL display card contains information Indicating the energy performance level and efficiencies of components <br /> Installed in a dwelling unit.The building official shag verify that the EPL display card completed and signed by the builder accurately mffecls the plans <br /> and specifications submitted to demonstrate compliance for the building.A copy of`h!' EPL display card can be found in Appendirx C. <br /> E3 R402A Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of <br /> Sections R402.1 through R402-4A. <br /> • R402.43 Building thermal envelope. The building thermal envelope shall comply with Sections R402A.1.1 and R402.4.1 2-The <br /> sealing methods between dissunitar mattenals shelf allow for cfifferentiat expansion and contraction. <br /> , R402.40.1 Installation. 'the components of the building thermal umnvebpe as listed in Table R402.4.1.1 shall be installed In <br /> accordance with the manufacturees Instructions and the afteria listed in Table 402A.1.1,as applicablo to the method of construction. <br /> Where required by the code official,an approved third party shall insp-c!all components and verify compliance, <br /> " R402A.1.2 Testing. The building or dwelling unit shaft be tested an,J verified as having an air leakage rate of not exceeding 6 air <br /> changes per hour in Climate Zones 11 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with <br /> a blower door at a pressure of 0-2 Inches w.g.(50 Pascals).Where r by the code official,testing shag be conducted by an <br /> approved third party.A written report of the results of the tea shag be signed by the party conducting the test and provided to the code <br /> Official.Testing shall be performed at-any time after creation of all ponsiations of the building thermal envelope- <br /> During testing: I <br /> 1.Exterior windows and doors,fireplaoe and stave doors shall be dos ,but not sealed,beyond the Intended weatherstr[Whg or <br /> other Infiltration control measures; <br /> 2-Dampers including exhaust,Wake,makeup air,backdraft and flue 4 lampers shall be closed,but not sealed beyond Wended <br /> infiltration control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> S.Healing and cooling systems,9 Installed at the time of the test,shag be turned oft and <br /> 0.Supply and return registers,it installed at the time of the test,shall be fully open. <br /> • R40ZAL2 Fireplaces.Now wood-burning fireplaces shall have fight-fitting ffule dampers and outdoor combustion air. <br /> 0 R402A.3 Fenestration air Ileakage.11%findow%skylights and sliding glass dears shall have an air infiltration rate of no more than 0.3 elm <br /> per square toot(1.5 L/sOm2),and swinging doors no more than 0.5 chn per square W(2.6 lds(m2),when tested according to NFRO 400 or <br /> AAL"DMAAGSA 101/1.SMA440 by an accredited,Independent laboratory and listed and tabeled by the manufacturer, <br /> Exception: Site-bunt windows,skylights and doors. <br /> 0 R4024A Recessed fighting. Recessed luminaires installed in the buldij,thermal envelope shall be sealed to limit air leakage <br /> between conditioned and unconditioned spaces*Ali recessed luminaires shq be IC-rated arid labeled as having an air leakage rate not <br /> mom than 2.0 cfrn(0.944 Lis)when tested in accordance with ASIM E 283 at a 1.57 psi(75 Pa)pressure differential.An recessed <br /> luminaires shall be sealed with a gasket or caulk between the housing and 1 Interiorwaft orcelfingcoveting. <br /> C1 R403-1.1 T henlrwdall provision(Mandatory). At least one thermostat shall be praidid for each separate heating and cooling system. <br /> a <br /> R4MI3 Heat pump supplementay heat(Mandatory). Heat pumps having supplementary electric-resistance heat shall have controls <br /> th8L.ex0ept during defrost,Prevent supplemental heal operation when the heat pump c I 6mpwmr can meet the heating load . <br /> 0 R40322 Sealing(Mandatori)AH ducts,air handlers,and filter boxes and building cavities that form the primary air containment <br /> passageways for air distribution systems shall be considered ducts and plenum chambers,shall be constructed and sealed in accordance <br /> withrSectlon-C403Z72 of the Commercial Provisions of this code and shall be shown mget;ducltlgW "eczftedabypost-construcgon <br /> or roughwin testing below I` <br /> Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by ertfter an energy rater certified In accordance with Section <br /> 553—q%Florida Statutes.or as authofted by Rovida Statutes,to be"substantially leak f fee"by either of the following. <br /> 1. Post-construction test:Total leakage shall be less than or equal to 4 cfm(113" in)per 100 square feel(929 m2)of conditioned floor area <br /> when tested at a pressure differential of 0-1 Inches w.g.(25 Pa)across the entire 1 tam,including the manufacturer's air handler enclosure.All <br /> register boots shall be taped or otherwise sealed during the feet. <br /> 2. Rough-In test Total leakage shall beless than or equal to 4 cftn(113 L/Imin)per 00 square feet(9.29 m2)of conditioned flow area when tested <br /> T <br /> at a pressure differential of 0.1 inches w.g.(25Pa)across the system,inducting the manulacturees air handler enclosure.Ali registers shag be <br /> taped or otherwise sealed during the test If the air handler is not installed at the time of the test,total leakage shag be loss than or equal to 3.cfm <br /> (85 Onin)per 100 square few(9"m2)of conditioned u=area. <br /> Exceptions: <br /> 1. The total leakage test is not required for ducts and air tku-4srs located Ong within the building envelope. <br /> 2. Duct testing Is not mandatory for buildings complying by Section R405 of this <br /> 0712412019 1.09.419 AM EnergyGaugeO USA-FlaRes2017 Section R405 4.1 Compliant Software Page 1 of 3 <br />