My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22207
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:11:30 PM
Creation date
3/24/2021 1:11:29 PM
Metadata
Fields
Template:
Building Department
Company Name
TOP FLOOR INVESTMENTS LLC
Building Department - Doc Type
Permit
Permit #
19-22207
Building Department - Name
TOP FLOOR INVESTMENTS LLC
Address
5251 3RD ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;.MART CHOICE ROOFING, LLC <br /> I <br /> Florida Certified Roofing Contractor CCC1332199 <br /> i <br /> 7014 Summer Holly P1. Riverview, F1 33578 <br /> Email: smartch6iceroofinciflorida(cbgmail.com Cell: (813) 35-3479. <br /> I <br /> Web: httpE;://smartchoicerooFingfiorida.com <br /> PROPOSAL/CONTRACT <br /> Proposal number: 1021 Date: 12/27/2019 <br /> 1 <br /> CLIENT PROPOSAL LOCATION: LOCAfnON OF WORK TO BE PERFORMED: <br /> Name: Christopher Smith Job site:TBD. <br /> Address: 5251 31d St Zephyrhills, FL 33542 <br /> SCOPE OF WORK: <br /> Complete roof installation with dimensional shingle roof meetin current Florida State 2017 Building Codes. <br /> In addition,all codes reflect current Wind mitigation requireme <br /> —General Requirements. Roof Material. Additional Work. <br /> a. Permits and Fees. a. Roof Color:TBD. a. Replace plywood$40 after 2nd sheet. <br /> b. Inspections. b. Roof Eve Metal:TBD. b. Extra layer of shingle$45 the SQ <br /> c. All Debris Removal. c. Roof Boots and Vents. each layer. <br /> BASES OF COMPENSATION: <br /> Total cost of Project Service: $6,200.00 <br /> Payment Structure: $3,100.00 Start/$3,100.00 Completion. <br /> Estimated time:TBD. Start date: TBD. <br /> Any deviation from above specifications.involving extra costs,will be Ixecuted only upon written orders,and will <br /> become an extra charge over and above the estimate.All agreeme its contingent upon delays beyond our control. <br /> Respectfully Submitted: Rayrr er Moncada <br /> Note: This proposal may be withdrawn by us 111 not accepted within 30 days. <br /> ACCEPTANCE OF PR POSAL , <br /> The above prices, specifications and conditions are satisfactory and are hereby accepted. <br /> Signature: Date: 12, / 2 <br /> MMM <br />
The URL can be used to link to this page
Your browser does not support the video tag.