Laserfiche WebLink
t <br /> TEMPORARY WELL CONST t1CT1ON <br /> Surface Completion: Stick-up: X Manhole; <br /> Stickup ht: 3' <br /> Ground Surface <br /> Upon completion; screen will be <br /> removed and hole will be <br /> backfilled with native soil and <br /> topped with Portland cement <br /> grout. <br /> Temporary Screen <br /> Type: Metal or PVC, <br /> Diameter: 1" <br /> Length: 51 <br /> . <br /> Slot size: 0.010". <br /> Filter.Pack <br /> Material: Native soil, <br /> Bottom of borehole: 30' Well Depth: 30--35 <br /> �^Hole dia: 4-6 <br /> NOT TO SCALE <br /> JonesEdmundP <br /> •mp well schematic.ads,GMW schematic(JEA);9t2512019 <br />