Laserfiche WebLink
the utility transformer to rest against the facia of the front gable end of the <br /> house. This must be corrected. The service point, riser, and meter need to be <br /> relocated to the West side of the home. New feeder conductors can be installed from' <br /> this location to the location of the interior electrical panel so long as the <br /> existing interior panel location meets NEC requirements. <br /> It is advised that electrical drawings of some form are drafted for contract and <br /> permitting purposes. Pattie Electric can provide the drafting service if requested. <br /> All new light fixtures and fans will be provided by the customer. <br /> All standard appliance circuits will be installed as per the electrical drawings. <br /> All lighting circuits will be installed as per the electrical drawings. <br /> All receptacle locations and circuits will be determined on site during <br /> installation. <br /> Pattie Electric will supply the bathroom exhaust fan and venting. <br /> New smoke detector locations and circuits will be determined on site during <br /> installation. <br /> All new combination type AFCI branch circuit breakers will be installed to meet NEC <br /> requirements. <br /> GFCI protection will ,be installed. where necessary for NEC required circuits. <br /> Quoted price does not include permit cost and application. This amount will be <br /> assessed by the building department at the time of application. <br /> Payment schedule as follows: <br /> 25% acceptance of proposal ($1, 900.00) <br /> 50% completion of rough in inspection ($3, 800.00) <br /> 25% completion of final inspection ($1, 900.00) <br /> > 10/31/2019 THU 9:22 AM> LELAND A: <br /> RTD <br /> > 10/31/2019 THU 11:14 AM> Justin s: <br /> Called customer left message to call back for quote. <br /> > 10/31/2019 THU 11:22 AM> just in s: <br /> Customer called received email and emailed quote <br /> > 11/18/2019 MON 1:23 PM> Daniel C: Customer called and stated they would like to <br /> go with us for the electrical but he first had to have the engineer come by and <br /> give a structural inspection before proceeding. <br /> > 11/25/2019 MON 10:33 AM> justin s: <br /> Customer paid 25% acceptance of proposal $1900 check#7132 <br /> Page 2 of 4 <br />