NOTICE OF DEED-RESTRICTIONS: The undersigned understands that this permit may be subject to"deed'res"ricttons" w
<br /> which:may be more restrictive than County regulations. The:undersigned assumes responsibility for compliance with any
<br /> applicable'deed•restrictions.
<br /> UNLICENSED_CONTRACTORS-AND.CONTRACTOR.RESPONSIBILITIES:" if the.owner has hired a contractor or
<br /> coniraators to undertake work they 'maybe required to be licensed;iri accordance With•state.and local regulations:"ifthe
<br /> contractor is not licensed as required by law,-both.the owner and contractor may be cited for a misdemeanor violation
<br /> under state law. if the owner or.Inten. contractor are uncertain,as to what licensing requtrerrients may for they
<br /> intended.work,they are advised to contact the Pasco Count contractor
<br /> Inspection`Division-Licensing Section at 727-847=
<br /> 8009. Furthermore,'if the owner has:Hired'a contractor or.contractors,.he it advised to have_the contractor(sj sign.
<br /> portions of the`contractor Block"of this application for which will be responsible. If-you,as the owner sign as the
<br /> contractor,that may be an indication that he is,not properly licensed and is not entitled to.permitting-pmrilegas in Pasco
<br /> County.
<br /> TRANSPORTATiON°IMPACTAMLITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Trarisportation Impact Fess and Recourse Recovery Fees may apply to,the'construction of new buildings,change of
<br /> .use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07:and
<br /> 90-07,as amended. The and ersigried also.understands,.that'such fees,as may be due,Kn71 be identified at the time of
<br /> permittting. .Ifis irirther understood that Transportation Impact Fees.and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate-of occupancy"or final power release. If the_project does notinvolve a certificate of occupancy or
<br /> final power release,the fees must.be.paid;prror to permit issuance. -Furthermore,if Pasco County Water/Sewer Impact.-
<br /> fess;are due,they++Yostbe paid prior to permit issuance In.accordance with appilcable.Pasco County ordinances.• -
<br /> CONSTRUCTION-'UEN-LAw(Chapter 713,Florida Statutes,as amendedj: If.valuation of work is$2, m.00 or more,I
<br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law.--Homeowner's
<br /> Protection'Guide"prepared by the Florida Department of Agriculture:and-Consumer Affairs: if the.applicant is someone
<br /> other than the o m
<br /> wner".I certify that I have obtained a copy of the.above described docuent and promise in good faith to
<br /> deliver.lt:to;the."owner"prior to commencement. -
<br /> CONTRACTOR'SIOWNER'SAFFIDAVIT: f ceitify'thaYall'the'inforriation in this appl'icatiori:is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction,zoning and land development Application is.
<br /> hereby made to obtain a permit to do work and installation es indicated. I-certify that no-work or installation has.
<br /> oommenoed,prior to,issuarrce-of.a permit and that all work will be performed to meet standarids,of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in-the jurisdictiori. 1 also
<br /> certify that 1 understand that the regulations of other government agencies may apply to the intended work,and that it Is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads,Wedand•Areas and,Environmentally Sensitive .
<br /> Lands,'Water/WastewateiTreatment '. -
<br /> Southwest Florida Water Management District Wells, Cypress Bayheads, Wetland Areas, Altering-
<br /> Watercourses.
<br /> Army Corps of Engineers-Seawalls,Docks,Navigable Waterways.
<br /> Department of Health & Rehabilitative Services/Envirorimental Health Unit-Wells, Wastewater:Treatment,.
<br /> Septic Tanks.:.. _
<br /> US Environmental Protecti on"Agency-Asbestos'abatement
<br /> Federal Aviation Authority-Runways.
<br /> I understand that the;following restrictions apply to the use of fill: _
<br /> Use-of fill is not allowed in Flood Zone'r unless_expressiy permitted.
<br /> If the.-fill material is to.be,used in Flood Zone A it is understood.that a drainage ptan addressing a
<br /> "compensating'voiume"will be submitted at time'of"pennitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the 91,matedai_is to be used do Flood Zone.A .in connection with a permitted building using stem wall,
<br /> construction,I certify that fill will be used only to fill the area within the stem wall .
<br /> - if fill material:is_to.be used in any area, I certify that use of such fill will not adversely-affect adjacent
<br /> properties. If use of"fill is found to adversely affect adjacent properties,the owner may be cited for violating
<br /> the conditions of the_building.permit.issued under_the.attached permit application,for lots less than one(1)
<br /> acre-whichre a elevatedby fill,an engineered drainage plan is required.
<br /> If I,am the AGENT FOR THE OWNER,-I promise in good faith to inforn the owner of the permitting conditions set forth in "
<br /> this-affidsvit prior to commencing construction. I understand that a_separate permit may be required for electrical work;
<br /> plumbing,sign,wells, pools,air conditioning,gas,or other installations not specifically included in the application. A
<br /> permit issued shall tie construed to be a license to proceed with'.the work and not as authority to violate,cancel,alter,or
<br /> set aside any provision of the technical code§,'nor shall issuance of a.permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans,.construction or violations of any codes. Every permit issued:shafl become invalid
<br /> unless the work authored-by-sucti permit is commenced'within six months of'oermit issuance,-or if work authorized by
<br /> the permit is suspended or abandoned for a period of'six(6)months after the time the'wd*is commenced. An extension
<br /> maybe requested,-in writing,from the Buiidir401ficial fora period not to exceed ninety(90)days and wili.demonstrate .
<br /> justifiable cause for the extension. If work ceases for ninety.(90)consecutive days,the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE-.OF COMMENCEMENT MAY,RESULT IN YOUR.
<br /> PAYING TWICE FOR IMPROVEMENTSTO,YOUR PROPERTY.,IF_YO_U,INTEND TO OBTAIN FINANCING,;CONSULT
<br /> WITH`YOUR LENDER OR AN ATTORN BEFORE RECORDING OTiCE OF COMMENCEMENT.
<br /> FLORIDA JURAT(F.S.117.03).
<br /> OWNER OR AGENT CON1RA&r
<br /> Subsambed and sWiUR1 to.{pr alrinn�)before me this Syhseitbed end (or effmmed)before this
<br /> Who Ware personally known to me or has/heve produced Who lemma. �ttrt f to me orhaaltmve produced
<br /> as Identification.' idenf}IlcafFon.
<br /> Notary PUWIC / Notary Public
<br /> Commission No. missbn No.
<br /> Name of Notary typed,Phmed or stamped Name of Nmerytyrped' • ,o;;` Notary Public-State of Florida
<br /> •�" • Commission I GG 112939; .
<br /> ,h�•,II- or My Comm.Ezpires9ul19,2021
<br /> Bonded through National Notary Assn.
<br />
|