Laserfiche WebLink
NOTICE OF DEED-RESTRICTIONS: The undersigned understands that this permit may be subject to"deed'res"ricttons" w <br /> which:may be more restrictive than County regulations. The:undersigned assumes responsibility for compliance with any <br /> applicable'deed•restrictions. <br /> UNLICENSED_CONTRACTORS-AND.CONTRACTOR.RESPONSIBILITIES:" if the.owner has hired a contractor or <br /> coniraators to undertake work they 'maybe required to be licensed;iri accordance With•state.and local regulations:"ifthe <br /> contractor is not licensed as required by law,-both.the owner and contractor may be cited for a misdemeanor violation <br /> under state law. if the owner or.Inten. contractor are uncertain,as to what licensing requtrerrients may for they <br /> intended.work,they are advised to contact the Pasco Count contractor <br /> Inspection`Division-Licensing Section at 727-847= <br /> 8009. Furthermore,'if the owner has:Hired'a contractor or.contractors,.he it advised to have_the contractor(sj sign. <br /> portions of the`contractor Block"of this application for which will be responsible. If-you,as the owner sign as the <br /> contractor,that may be an indication that he is,not properly licensed and is not entitled to.permitting-pmrilegas in Pasco <br /> County. <br /> TRANSPORTATiON°IMPACTAMLITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> that Trarisportation Impact Fess and Recourse Recovery Fees may apply to,the'construction of new buildings,change of <br /> .use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07:and <br /> 90-07,as amended. The and ersigried also.understands,.that'such fees,as may be due,Kn71 be identified at the time of <br /> permittting. .Ifis irirther understood that Transportation Impact Fees.and Resource Recovery Fees must be paid prior to <br /> receiving a"certificate-of occupancy"or final power release. If the_project does notinvolve a certificate of occupancy or <br /> final power release,the fees must.be.paid;prror to permit issuance. -Furthermore,if Pasco County Water/Sewer Impact.- <br /> fess;are due,they++Yostbe paid prior to permit issuance In.accordance with appilcable.Pasco County ordinances.• - <br /> CONSTRUCTION-'UEN-LAw(Chapter 713,Florida Statutes,as amendedj: If.valuation of work is$2, m.00 or more,I <br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law.--Homeowner's <br /> Protection'Guide"prepared by the Florida Department of Agriculture:and-Consumer Affairs: if the.applicant is someone <br /> other than the o m <br /> wner".I certify that I have obtained a copy of the.above described docuent and promise in good faith to <br /> deliver.lt:to;the."owner"prior to commencement. - <br /> CONTRACTOR'SIOWNER'SAFFIDAVIT: f ceitify'thaYall'the'inforriation in this appl'icatiori:is accurate and that all work <br /> will be done in compliance with all applicable laws regulating construction,zoning and land development Application is. <br /> hereby made to obtain a permit to do work and installation es indicated. I-certify that no-work or installation has. <br /> oommenoed,prior to,issuarrce-of.a permit and that all work will be performed to meet standarids,of all laws regulating <br /> construction, County and City codes, zoning regulations, and land development regulations in-the jurisdictiori. 1 also <br /> certify that 1 understand that the regulations of other government agencies may apply to the intended work,and that it Is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: <br /> Department of Environmental Protection-Cypress Bayheads,Wedand•Areas and,Environmentally Sensitive . <br /> Lands,'Water/WastewateiTreatment '. - <br /> Southwest Florida Water Management District Wells, Cypress Bayheads, Wetland Areas, Altering- <br /> Watercourses. <br /> Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. <br /> Department of Health & Rehabilitative Services/Envirorimental Health Unit-Wells, Wastewater:Treatment,. <br /> Septic Tanks.:.. _ <br /> US Environmental Protecti on"Agency-Asbestos'abatement <br /> Federal Aviation Authority-Runways. <br /> I understand that the;following restrictions apply to the use of fill: _ <br /> Use-of fill is not allowed in Flood Zone'r unless_expressiy permitted. <br /> If the.-fill material is to.be,used in Flood Zone A it is understood.that a drainage ptan addressing a <br /> "compensating'voiume"will be submitted at time'of"pennitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> If the 91,matedai_is to be used do Flood Zone.A .in connection with a permitted building using stem wall, <br /> construction,I certify that fill will be used only to fill the area within the stem wall . <br /> - if fill material:is_to.be used in any area, I certify that use of such fill will not adversely-affect adjacent <br /> properties. If use of"fill is found to adversely affect adjacent properties,the owner may be cited for violating <br /> the conditions of the_building.permit.issued under_the.attached permit application,for lots less than one(1) <br /> acre-whichre a elevatedby fill,an engineered drainage plan is required. <br /> If I,am the AGENT FOR THE OWNER,-I promise in good faith to inforn the owner of the permitting conditions set forth in " <br /> this-affidsvit prior to commencing construction. I understand that a_separate permit may be required for electrical work; <br /> plumbing,sign,wells, pools,air conditioning,gas,or other installations not specifically included in the application. A <br /> permit issued shall tie construed to be a license to proceed with'.the work and not as authority to violate,cancel,alter,or <br /> set aside any provision of the technical code§,'nor shall issuance of a.permit prevent the Building Official from thereafter <br /> requiring a correction of errors in plans,.construction or violations of any codes. Every permit issued:shafl become invalid <br /> unless the work authored-by-sucti permit is commenced'within six months of'oermit issuance,-or if work authorized by <br /> the permit is suspended or abandoned for a period of'six(6)months after the time the'wd*is commenced. An extension <br /> maybe requested,-in writing,from the Buiidir401ficial fora period not to exceed ninety(90)days and wili.demonstrate . <br /> justifiable cause for the extension. If work ceases for ninety.(90)consecutive days,the job is considered abandoned. <br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE-.OF COMMENCEMENT MAY,RESULT IN YOUR. <br /> PAYING TWICE FOR IMPROVEMENTSTO,YOUR PROPERTY.,IF_YO_U,INTEND TO OBTAIN FINANCING,;CONSULT <br /> WITH`YOUR LENDER OR AN ATTORN BEFORE RECORDING OTiCE OF COMMENCEMENT. <br /> FLORIDA JURAT(F.S.117.03). <br /> OWNER OR AGENT CON1RA&r <br /> Subsambed and sWiUR1 to.{pr alrinn�)before me this Syhseitbed end (or effmmed)before this <br /> Who Ware personally known to me or has/heve produced Who lemma. �ttrt f to me orhaaltmve produced <br /> as Identification.' idenf}IlcafFon. <br /> Notary PUWIC / Notary Public <br /> Commission No. missbn No. <br /> Name of Notary typed,Phmed or stamped Name of Nmerytyrped' • ,o;;` Notary Public-State of Florida <br /> •�" • Commission I GG 112939; . <br /> ,h�•,II- or My Comm.Ezpires9ul19,2021 <br /> Bonded through National Notary Assn. <br />