Laserfiche WebLink
23,. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. It accordance with the Land Development Code, lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for-hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V.inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:water heater to a distribution manifold:. <br /> Piping located under'a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other han demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26 A copy of the enemy cacls shall be with permit at ali times. <br /> 27. CoPV of r1hat insulation -report shalt be Pr6vided Permit be ore finaL <br /> 28. No Leme,pool or screen enclosure Is issued with'th ispermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />