Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 40 .11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots hall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R value) of R-3.shall.be applied to the <br /> following: <br /> Piping �1, inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from the water heater to.a distribution manifold. <br /> .Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems, <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A co o -the ene.r cacls shall be withPerm it at all times- <br /> 27. Co o_ inal insulation re ort shall-be provided witir permit be.ore r1hA <br /> 28.No enee ool or screen enclosure :is issued with:thhv.permit, <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C= Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act. N.E.C.-IS ational Electric Code (2016) <br />