Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 40 .11 of the 2016 N.E.0 <br /> 24. It accordance with the Land Develop_merit Code, lots shall be sodded before final At least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with"a minimum thermal resist rice (R-value) of R-3 shall be appl I.ied to the <br /> folio-wing: <br /> Piping 31, inch (1.9.1 mm) and larger in nominal diameter <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold:, <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other t ian demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A c op of the ener cacls'shall be.with Oermit at all times <br /> 27. Co o . itial.insulation-re ort shall be rovided wit ermit be ore final <br /> 28. No hence, Pool or screen enclosure :is issued with.th ermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6ffi Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />