Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 40 .11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot Water.pipe insulation. <br /> Insulation for hot.water pipe with a minimum thermal resist- nob (R-value) of R-3 shall tie applied to the <br /> following: <br /> Piping 31, inch (1.9.1 mm) and larger in nominal diameter <br /> Piping serving more than:one dwelling unit: <br /> Piping located outside the conditioned space., <br /> Piping from the water heater to a distribution manifold:- <br /> Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other t an demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A co o the ener cacls shall be with Permit at all times. <br /> 27.. CoPV.o. MaUitsuladon report shall-be pt6vided witk Peimit be ore rinaL <br /> 28.No fence, pool or screen enclosure :is issued with A s-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-N ational Electric Code (2016) <br />