Laserfiche WebLink
2017 - AIR BARRIER AND INSULATION INSPECTION COMP NENT CRITERIA <br /> TABLE 402.4.1. <br /> AIR BARRIER AND INSULATION INSPECTI N COMPONENT CRITERIA <br /> Project Name: Cali 1828 Elev D Bull er Name: DRH Express Homes <br /> Street: Per it Office: <br /> City,State,Zip: Zephyrhills,FL, Per it Number: Y <br /> U <br /> Owner: Juris iction: w <br /> Design Location: FL,Tampa v <br /> COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA <br /> General A continuous air barrier shall be installed in the building envelo�e. Air-permeable insulation shall <br /> The exterior thermal envelope contains a continuous air barrier not be used as a sealing material. <br /> requirements Breaks or joints in the air barrier shall be sealed. <br /> Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned wit The insulation in any dropped ceiling/soffit <br /> the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. <br /> Access openings,drop down stairs or knee wall doors to <br /> unconditioned attic spaces shall be sealed. <br /> Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame.walls <br /> The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity <br /> sealed. with a material having a thermal resistance of R-3 <br /> Knee walls shall be sealed. per inch minimum. <br /> Exterior thermal envelope insulation for framed <br /> walls shall be installed in substantial contact and <br /> continuous alignment with the air barrier. <br /> Windows,skylights The space between window/doorjambs and framing,and <br /> and doors skylights and framing shall be sealed. <br /> Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. <br /> Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to <br /> (including insulation. maintain permanent contact with the underside of <br /> above-garage subfloor decking,or floor framing cavity insulation <br /> and cantilevered shall be permitted to be in contact with the top side <br /> floors) of sheathing,or continuous insulation installed on <br /> the underside of floor framing and extends from the <br /> bottom to the top of all perimeter floor framing <br /> members.. <br /> Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation <br /> a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace <br /> Shafts,penetrations Duct shafts,utility penetrations,and flue shafts opening to <br /> exterior or unconditioned space shall be sealed. <br /> Batts in narrow cavities shall be cut to fit,or narrow <br /> Narrow cavities cavities shall be filled by insulation that on <br /> installation readily conforms to the available cavity <br /> spaces. <br /> Garage separation Air sealing shall-be provided between the garage and conditione spa s. <br /> Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building <br /> shall_be sealed to the drywall. thermal envelope shall be air tight and IC rated. <br /> Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring <br /> and plumbing in exterior walls,or insulation that on <br /> installation readily conforms to available space shall <br /> Pytpnri behind p1ping and wiring. <br /> Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall <br /> on exterior wall tubs shall separate them from the showers and tubs. be insulated. <br /> Electrical/phone box or The air barrier shall be installed behind electrical or communicati n <br /> exterior walls boxes or air-sealed boxes shall be installed. <br /> HVAC register boots HVAC register boots that penetrate building thermal envelope sh II <br /> be sealed to the sub-floor or drywall. <br /> Concealed When required to be sealed,concealed fire sprinklers shall only be <br /> sprinklers sealed in a manner that is recommended by the manufacturer. <br /> Caulking or other adhesive sealants shall not be used to fill voids <br /> and walls or ceilinos. <br /> a.In addition,inspection of log walls shall be in accordance with the provisions of]CC-400. <br /> 11/5/2019 11:45 AM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edi ion(2017) Compliant Software Page 1 of 1 <br />