Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 40 .11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation. <br /> Insulation for hot water'pipe with a minimum thermal resist nce (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3/; inch (1.9-1 mm)and largerin.nominal diameter <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to:a distribution manifold:. <br /> Piping located under a floor slab. <br /> Buried in piping- <br /> Supply and return piping in recirculation systems other than,demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O; <br /> 26. A c-op <br /> y o -the-enerjzv.cacls shall be ivith Pit at all times <br /> 27. Cop o itzal-hisulation re ortshall be ptovided with f ermit before r1haL <br /> 28. Nofence,pool or screen enclosure as issued with:th s pernzit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.- ational Electric Code (2016). <br />