NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the"owner has hired a contractor or
<br /> contractors to undertake-work, they maybe required to be licensed,in.accordance with state and local regulations. if the
<br /> contractor is not licensed as required by law, both the owner and contractor may be citedfor a misdemeanor violation
<br /> under state law. If the owner or,intended'contractor are uncertain.,as:to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building.Inspection Divi6lon—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has! hired'a-contractor or contractors, he.is.advised. to have the contractor(s) sign
<br /> portions of the "contractor Block" of this application for which they will be responsible. if-you, as the.owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting-privileges in Pasco
<br /> County. i I '
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery-Fees.may apply to the.construction of new buildings, change of
<br /> use in existing buildings, or expansion;of existing buildings, as specified in Pasco County Ordinance number 89-07 and--
<br /> 90-07, as amended. The undersigned lalso understands,-that such fees, as maybe due, Will be identified at the time of
<br /> permitting. It is further Understood that Transportation impact-Fees andResource Recovery Fees must be paid prior to
<br /> receiving.a "certificate of occupancy" or; final power release. If the:project does not involve a certificate of-occupancy or
<br /> final power release; the fees must be'paid prior to permit issuance. Furthermore, if"Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter.'713,-Florida Statutes,as.amendb.d): If valuation of work is$2,5.00.00.or more, I
<br /> certify that 1, 'the applicant, have been-provided with a copy of--the-''Florida,Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department ofAgricultUre:and:Consumer Affairs. If the applicant,is someone
<br /> other than the"owner", I certify that I ha Ve obtained a copy.of the above described document and promise in good faith to
<br /> deliver it to the"owner".prior to commencement.,
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT:. I-certifytthat all the information in:this,application is accurate!and•that allwork
<br /> will be done-in compliance with all applicable laws regulating construction, zoning and,land-development. Application is
<br /> hereby made to obtain a permit to do work and installation-as indicated. I certify that no work or installation has
<br /> idi - , standards of all laws regulating
<br /> commenced prior to issuance of a permit and that all work will be pprforme - 6 -m- eet..
<br /> I zoning construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> i p
<br /> certify-that I understand that the regulations of other government-agencies'rha Y-,P pply to-the intended work, and that it is
<br /> '
<br /> my responsibility to identify what actions) must-take to'be in compliance.- Such agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, Wetland.Areas.and-..Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> 'Southwest Florida Water i Management District-Wells, Cypress 'Bayheads,l Wetland Areas, .Altering
<br /> Watercourses.
<br /> Army Corps.of Engineers-Seawalls, Docks Navigdble-Wakerw ays.
<br /> Department of Health &-Rehabilitative ServicesthViftinmen"fal-Health Unit-Wells, --Wastewater Treatment,
<br /> Septic Tanks.
<br /> US Erivironme6tal.'Pr6tedion Agency-Asbestos abatement.
<br /> Feder6f Aviation Atfi6rity-Runways.
<br /> I understand that-the following,restrictioris a*pply-to.the-use'dffill;
<br /> 7 Use-of.fill,ii not allowed in Flood Zone"V".uni6ii-.iikoressly--permifted.
<br /> - If the fill' miakie'el-ail iis to,
<br /> ' be:used in Flood that a drainage plan addressing a
<br /> -"compensating volume".willbe-Submitted at time of permitting-which-is prepared-by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the'fill material-is to--be used in Flood Zone- in connection with a permitted building. using stem wall
<br /> construction,.1-c6ttity that fill will be'-used-oniy ti #ill the-area'within the stem wall.
<br /> If fill material is to be used In any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties.-if use of fill,
<br /> properties. Io.-adversely affect adjacent properties-,-the owner may-be--clted for violating
<br /> the conditions of the buildirig permit Issued under the attached permit application, for lots less than one (1)
<br /> acre which'are-elevate&by fill,an engineered:drainage plan'IS required.
<br /> If I am.the AGENT FOR THE OWNER, [prom Ise in good faith to inform-the-owner.of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction.
<br /> stifluction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning..gasi-or other insta0ations not specificalljr included in the-application. A
<br /> permit issued shall be construed to be a,license to,proceed with.the work and not as authority to violate cancel, alter, or
<br /> set aside any provisions of the'.techhIc6I:'dodes-, nor shall issuance of a permit prevent the Building-Official-from-thereafter
<br /> requiring a correctiomof errors in plans, construction or violations of.an-y codes Every permit`issued-shall become invalid
<br /> unless the work
<br /> rk authorized by such permit is commenced within six months of,permit issuance, or if work authorized..by
<br /> the permit is suspended or abandoned for a period of six(6)months aftdif-thi§time the.work is commenced. An-extension
<br /> may be requested, in writing, from the Building.Official for,'a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension: If work.cdases-.for ninety(90).,donsecutive days,the job is considered abandoned.
<br /> WARNING TO--OWNER: YOUR FAILURE TO%RECORD-vA NOTICE.-OF COMMENCEMENT MAY RESULT-IN YOUR
<br /> N -
<br /> PAYING TWICE FOR IMPROVEMENTS,-,,*TO'�YOUR!PFtOPERTY:--IFYOU-.-INT�END:TO-OBTAIN-FINANC7 I G-,C-0NSULT--_- __
<br /> WITH-YOUR.LENDER-OR--AN-AT-T-OkbitY,'B-ItF.ORE�,kECOitDIN-6-Y(!(.Jk--NOVICE OF-COMMENCEMENT.
<br /> -FLORIDA JURAT(F.S.117.03)
<br /> OWNER OR AGENT CONTRACTOR:
<br /> Subscribed and sworn to(or affirmed)before me this §ubqcdbeJand 10 r affirmad)before me this,
<br /> ffirm w or4
<br /> s*
<br /> b 1- 15 by
<br /> y c
<br /> Is/arApersonal yy known to m
<br /> Who is/are personally known to me or has/have produced a or has/have produced
<br /> as identification. 7( Li as C as identification.
<br /> Notary Public
<br /> Notary Public
<br /> Commission No Commis on or
<br /> Name of Notary typed,printed or stamped Name of Notary
<br /> jACQUELINEBMS
<br /> -'gip. #GG 276457
<br /> 4*1 E*nisoecembeiriZ2022
<br /> MW—W
<br />
|