Laserfiche WebLink
K <br /> 23. Tamper- Resistant Receptacles in accordance with 40 .11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall,be applied to the <br /> following: <br /> Piping 31. inch (19.1 mm) and larger in nominal,diameter <br /> Piping.serving more than:one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping-from the:water heater to a distribution manifold:. <br /> Piping located under.a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O: <br /> 26. A copy of the eizerry cacls-shall be with Permit at all tunes. <br /> 27., Co o cnal insulation re ort shalhbe rovided wit a ermit before r1h A <br /> 28. No feftce, Pool or screen enclosure :is issued with ih s permit. <br /> F.F.E.-Finished Floor Elevation <br /> RB.C-.Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.- ational Electric Code(2016) <br />