Laserfiche WebLink
]8O. 0. 2870 9:85AM ' NO. A648 P. 5 <br /> Limits of Use Cerdfication Agency Certificate <br /> Approved for use in HVHZ-.No FUS279 R5 C CAC Lemer with proof of contract and proof of <br /> Approved for use outside HVIIZI.Yes :tns2C4*W <br /> Design Pressure:+25 PSF/-25 PSF Quality Assurance Contract Expiration Date <br /> Other.Solid doors(no gla2lng)or doors with optional impact- 05/21/2028 <br /> resistant glazing are impatt-mlstant(large missile Impact). Installation Instructions <br /> Verified By:rntertek Testing Services NA,Inc. <br /> Created by Independent Thlrd Party: <br /> Evailuallion Reports <br /> Created by Independent Third Party: <br /> Limits of Use Cert1flicadon Agency Certificate <br /> Approved for use in"VHZi No FLIS279 RS C CAQ Letter with pmof of contract and proof of <br /> Approved for use outside WK.Yes jMI1ffMQ1IjW <br /> Oeslgn Pressure:+25 PSF/-32 PSF Quallilly Assurance Contract Expiration Date <br /> Other.,Solid doom(no glazing)or doors with optional impact- 05/211202$ <br /> resistant glazing are impact-resistant(large rnisalle impact), Installation Instructions <br /> Verified By.,Inbertek Testing Services NA,Inc. <br /> Created by Independent Third Party: <br /> Evaluation Reports <br /> Created by Independent Third Party: <br /> Limits of Use Certification Agency Certificate <br /> Approved for use In HVHZ:No rLI52')9 PS !C CAC Ietter with proof of contract and proof of <br /> Approved for usia outside HVHZ.,Yes lm�� <br /> Design Pressure:+24 PSF/-24.5 PSF Quality Assurance Contract Expiration Date <br /> other.Solid doors(no glazing)or doors With optional Impact- 05/2112028 <br /> resistant glazing are Impad-resistant(large missile impact). Insta"ation;nstructio1w <br /> Verified By:Intertek Testing Services NA,Inc. <br /> Created by Independent Third Party: <br /> Evaluation Reports <br /> Created by Independent Third Party: <br /> Limits of Use Certification Agency Certificate <br /> Approved for Use outside HVMZI Yea M89kawalof <br /> Design Pressure.,*25 PSFI-25 PSF Quality Assura"46 contract expiration Data <br /> Other solid doors(no glazing)or doors with optional impact- 05/2V2028 <br /> resTstant glazing are Impact-reststant(large missIle Impact). Installation instructions <br /> Verified By.,Intertek Testing Services NA,Inc. <br /> Created by Independent Third Party. <br /> Evaluation Reports <br /> Created by Independent'Ibird Party: <br /> GR25P,6021.P�GULP,AR2SP, (eyterlor skin 27 ga,min,;Interior sidn 27 ga,minj SIngle-Car <br /> Limits of Use Certification Agency Certificate <br /> Approved for use In HVHZ: No FLIS279 RS C C&C Letter With p W!Qf gontract an proof of <br /> Approved for use outside HVHZ:Yes jWMfi2aj3df <br /> Impact Resistant.Yes FL15279 PS C CAC— Listing Inbertek,gid <br /> Design Pressure;+28 PSFI-29 PSF Quality Assurance Contract Bolratilan Date <br /> Other.-Solid doors(no glazing)are Impact-resistant(large 05121/2028 <br />