Laserfiche WebLink
e <br /> 23, Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Larid Development Code,lots.shall be-sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3/:inch (1.9.1 mm)and larger in, nominal diameter._ <br /> Piping:serving more than_one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from thew btet heater to a distribution manifold:. <br /> Piping Iodated under,a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A copy of the energgy cacls shall be with permit at all times <br /> 27. Copy of f1hal:insulation report shalt&-provided with permit before fnaL <br /> 28. No fence, pool or 'enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) - <br />