Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10. <br /> feet around the structure. <br /> 25-. R403.5.3Hot water pipe insulation <br /> Insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3/< inch (19:1 mm)and larger in.nominal diameter.- <br /> Piping serving more than_one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:water heater to a'distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the enerey caels shall be ivith permit at all times. <br /> 27. Copt/of final:insulation report shall be provided with permit before fnaii <br /> 28.1 No.fence, pool or screen enclosure Is issued with:this permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W-Right of Way <br /> A.D.A.-Americans with Disabilities Act. N.E.C.-National Electric Code(2016) <br />