Laserfiche WebLink
23. Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-. R403.5.3Hotwater.pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31; inch (19.1 mm) and larger in nominal diameter.. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside'the"conditioned space. <br /> Piping from the Water-'heater to a distribution manifold:. <br /> Piping located under.'a floor slab,. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the energy cads shall be.with permit at all times. <br /> 27. Copy of final insulation report shall A?provided with Peenzit before final <br /> 28:No fence,pool or'scrMz enclosure Is issued with ahis permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />