Laserfiche WebLink
._y <br /> 21 Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before_ final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R.value) of R-3 shall be applied to the <br /> following:_ <br /> Piping�1.inch (19.1 mm) and larger in. nominal diameter. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from the water heater to a distribution manifold, <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and'return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A copy ofthe enerQy back shall be with permit at all dines <br /> -2Z Copy,offinal.insulation report shaft be provided with permit before linaL <br /> 28. No fence,-Pool or screen-enclosure Is issued with.this-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />