Laserfiche WebLink
813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 <br /> Building Department <br /> 1 Date Received Phone Contact for Permitting -- <br /> Owner's Name t ' 1 a` n �C , Owner Phone Number <br /> f Owner's Address OJ Owner Phone Number <br /> Owner Phone Number <br /> JOB ADDRESS I-CL Z LOT'# <br /> SUBDIVISION D�`� ��CAZ $�] <br /> PARCEL ID# 0 a-21,-6 - QOLOI <br /> (OBTAINED FROM PROPERTY TAX NOTICE) <br /> WORK PROPOSED a NEW CONSTR 8 ADD/ALT = SIGN = = DEMOLISH <br /> INSTALL REPAIR <br /> PROPOSED USE = SFR Q COMM = OTHER <br /> TYPE OF CONSTRUCTION = BLOCK Q FRAME = STEEL = <br /> DESCRIPTION OF WORK - Of St\(/N ('S <br /> BUILDING SIZE F SQ FOOTAGE F__ ---I HEIGHT <br /> =BUILDING $ VALUATION OF TOTAL CONSTRUCTION <br /> =ELECTRICAL $ AMP SERVICE = DUKE ENERGY Q W.R.E.C. <br /> =PLUMBING $ <br /> =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION <br /> =GAS = ROOFING SPECIALTY = OTHER <br /> FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO <br /> BUILDER COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURREN Y/N <br /> Address License# <br /> ELECTRICIAN COMPANY <br /> SIGNATURE REGISTERED Y/ N_J FEE CURREN Y/N <br /> Address License# <br /> PLUMBER COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURREN <br /> Address License# <br /> MECHANICAL COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURREN <br /> Address License# <br /> OTHER COMPANY 'ek "i ldTt o-+e <br /> SIGNATURE REGISTERED Y/ N FEE CURREN Y/N 33�r1 <br /> Address ® "?O I I sr, License# CeGo�� Cjs <br /> RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, <br /> Minimum ten(10)working days.after submittal date. Required onsite,-Construction Plans,Stormwater Plans w/'SIIt Fence installed, <br /> Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects <br /> COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. <br /> Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, <br /> Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance <br /> SIGN PERMIT Attach(2)sets of Engineered Plans. <br /> """PROPERTY SURVEY required for all NEW construction. <br /> Directions: <br /> Fill out application completely. <br /> Owner&Contractor sign back of application,notarized. <br /> If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500) <br /> *' Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same <br /> OVER THE COUNTER PERMITTING (copy of contract required) <br /> Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) <br /> Driveways-Not over Counter if on public roadways..needs ROW <br />