Laserfiche WebLink
DESIGN CONDITIONS TECHNICAL SALES CORPORATION <br /> GPM 145 4621 N. HALE AVENUE <br /> Fr/TDH 25.5 TAMPA, FLORIDA 33614 <br /> VOLTAGE 208 230 460 PH (813) 876-9256 FAX (813) 874-1194 <br /> �AL/ 460 <br /> PHASE SINGLE HRE HIDDEN RIVER#3 <br /> PUMP EBARA JOB: <br /> MODEL 100DLFU62.2 (3HP) CIS: 1803-4996 (2) 4-AWWA FLANGED <br /> MOUNTING POST AND SERVICE DISCONNECT 1 (2) 04- CAST SWING CHECK VALVES <br /> W/ LIGHTNING ARRESTOR PER LOCAL CODE IRON COUPLINGS OUTSIDE LEVER AND WEIGHT <br /> (BY ELECTRICAL CONTRACTOR) <br /> MOUNT CONTROL PANEL <br /> ON HINGE SIDE OF ACCESS <br /> COVER FOR OPERATOR SAFETY <br /> 26" <br /> CENTER <br /> UNE <br /> HOSE 81 W/ BACK FLOW PER <br /> LOCAL CODE (NOT SUPPLIED BY 7SC) \j <br /> 1_7 <br /> 078" ROUND 300 PSF <br /> LOAD RATED ALUMINUM TOP <br /> (3) 4- AWWA FLANGED RESILIENT SEAT AGATE <br /> FL DEP-LOCKABLE CONTROL PLAN VALVES W/ OPERATING SHUTOFF HAND WHEEL <br /> LOCAL <br /> PANEL GENERATOR <br /> RECEPTACLE <br /> 36" LOCKABLE HATCH(2) GAS-TIGHT SEAL OFFS SS HINGES AND HARDWARE 300 PSF LOADING <br /> 0 <br /> (1) F/G JUNCTION BOX (6) HOOK SS 48- X 48- X 36- COMPOSffE VALVE BOX (H-10 RATED) <br /> 04* HOLDER ALUMINUM TOP 48" X 48" DOUBLE DOOR LOCKABLE BATCH <br /> - 8 SS HINGES AND HARDWARE 300 P.S.F. LOADING <br /> 12r) 90�1 SS GUIDE <br /> RAIL BRACKETS <br /> LOCKING HASP BYPASS CONFORMS TO <br /> EL. 73.11 64-604.4(2)(A)F.A.C. <br /> TOP <br /> FIELD INSTALL <br /> DUCT S IELD <br /> DUCT SEAL <br /> 37" 24" <br /> (3) 0 2- <br /> CONDUITS <br /> Y(2) 6- X 6- X 9' <br /> CONCRETE POSTS <br /> \,-FACTORY INSTALLED 02" PVC <br /> COUPLING FOR P-TRAP <br /> LINK-SIEALO(THLS-400S) (TYP) DISCHARGE 04' <br /> FOR PUMP DISCHARGE PIPES SCH 80 PVC PIPE <br /> 08" SCH 80 PVC 2" X 2' RUBBER COUPLING <br /> INLET PIPE FIELD <br /> LOCATED (2) SS LIFT CHAINS <br /> 1B4.2.0 W, 64 24t,. <br /> EL INLET (2) 04 SCH 80 PVC DISCHARGE PIPES <br /> EL, 64.20 4 j (2) EBARA PUMPS <br /> HIGH LEVEL <br /> 4.00 3 WET WELL - H-20 TRAFFIC RATED <br /> EL 6 FIBERGLASS REINFORCED POLYESTER <br /> LAG PUMP ON--7-T <br /> EL 63.50 MONOLITHIC DESIGN ASTM D3753 <br /> LEAD PUMP ON EBARA QDC GUIDE RAIL SYSTEM-FOR <br /> PUMP REMOVAL WITHOUT ENTERING WETWELL <br /> (OSHA, F.D.FP. & 0 STATES STANDARDS EQUIPMENT) <br /> PUMP OFF <br /> 12.11' EL 62.50 (2) FLANGE ELBOWS <br /> ll_�_IIMBEDDED FIBERGLASS REINFORCING 'C' CHANNEL <br /> ., IS INTEGRAL TO BOTTOM <br /> 6-X6- FILLET (FACTORY INSTALLED FIBERGLASS) <br /> CONCRETE BALLAST AS REQUIRED (FIELD INSTALLED) <br /> EL 61.00v <br /> STATION DEPTH - CONCRETE = 3.699 LBS/CU YD <br /> BOTTOM <br /> 6 FT X 8 FT REQ. 14,095 LBS = 3.81 YDS <br /> 24' 6 FT X 10 FT REQ. 17.619 LBS = .4.76 YDS; <br /> 72" I.D.— 6 FT X 12 FT REQ. 21,142 LBS = 5.72 YOS <br /> X 14 FT REQ. 24.660 LBS = 6.67 YDS <br /> SECT I ON 6 6 FT FT X 16 FT REQ. 28,190 LBS = 7.62 YDS <br /> 72" DUPLEX STATION - 4" PIPING 6 FT X 20 FT REQ. 35.237 LBS = 9.53 YDS <br /> WITH SLIDE RAIL SYSTEM, V.B. 'AND F.D.E.P. PANEL MODEL <br /> TSC PRE-FOB PUMP SOLUTIONS(C) TSC2-72.4 R9.dwg(D <br />