Laserfiche WebLink
TECHNICAL SALES CORPORATION— PRE-FAB PUMP SOLUTIONS © PACKAGE <br /> 4811 <br /> , 60" AND 72" DIAMETER SEWAGE PUMPING STATIONS <br /> H- 20 WHEEL LOADING RATED-MONOLITHIC FIBERGLASS WET WELLS <br /> ALUMINUM TOP W/ACCESS HATCH- load rated for 6,000 pounds <br /> Pre-Fab Pump Solutions©Wet well and valve box systems are a very sturdy design, capable of <br /> enduring jobsite conditions, rough handling, uneven earth loading and wet concrete for anti-float <br /> ballast. The system can withstand occasional wheel traffic, but shall not be located in a traffic area. <br /> A.1 FRP—FIBERGLASS REINFORCED POLYESTER— MONOLITHIC DESIGN <br /> Wet well shall be serial numbered and certified to be H-20 load rated and conform to A.S.T.M. D 3753 <br /> (latest version). Wet well shall be an integral, one-piece design with top flange, walls, bottom and anti-float <br /> flange all incorporated into a single watertight unit. To establish this H2O rating, the wet well shall not leak, <br /> crack or suffer other damage when load tested to 40,000 ft-lbs. Professional Engineer Certification shall <br /> be available upon request. Ebara pumps and Pre-Fab Pump Solutions©Wet wells are to be furnished by <br /> Technical Sales Corporation, 4621 N. Hale Ave. Tampa, FL 33614. Ph: 813-876-9256, Fax: 813-874-1194. <br /> No substitution unless engineer of record has pre-approved an equal. <br /> A.2 MATERIALS: POLYESTER RESINS AND FIBERGLASS WOVING <br /> The resin system shall be designed for atmospheres containing sulfuric acid, gases and liquids associated <br /> with wastewater collection systems. The resulting reinforced plastic material must meet the requirements of <br /> A.S.T.M. D 3753 specification and be suitable for the harsh wastewater environment. <br /> The exterior surface shall have a gray UV inhibitor resin coating-minimum of.125-inch thickness. <br /> A.3 MONOLITHIC FABRICATION AND PHYSICAL REQUIREMENTS: A.S.T.M. D3753 (SEC6) <br /> The internal surface shall be smooth to prevent grease and scum from attaching to the walls. The use of <br /> corrugated material is not allowed. The bottom and any reinforcement necessary are to be completely <br /> enclosed with fiberglass lay up. Pump stub outs, electrical, service inlets and discharge lines shall be factory <br /> installed per A.S.T.M. D3299. Field inlets shall be installed by approved methods and with materials <br /> furnished by Technical Sales Corporation. The use of fiberglass pipe, tube or liner embedded into a <br /> concrete base does not meet A.S.T.M. D 3753 and will not be accepted. <br /> A.4 ALUMINUM TOP WITH 24"x 36" HATCH COVER ACCESS- tested at 6,000# <br /> TEST RESULTS UPON REQUEST <br /> Aluminum top shall be W thick diamond plate, specially reinforced to 300#psf live load and total loading of <br /> 6,000#. Hatch door shall have automatic hold open S/S safety arm and tamper proof S/S hinges. The <br /> aluminum top cover shall be through bolted to the top flange to form a robust lid capable of withstanding <br /> occasional wheel loads. Wet well tops shall be all aluminum. If a concrete slab-is to be installed, the <br /> fiberglass top shall include a neck extension for the aluminum hatch for the full thickness of the slab. <br /> The use of a concrete top piece, where concrete is exposed to the sewer gases, is not permitted. <br /> A.5 FIELD PENETRATIONS AND INLET HUBS: use only the epoxy kits furnished by TSC <br /> Field penetrations for inlet hubs and cutouts can be made with a hole or jigsaw and shall be sealed with <br /> waterproof epoxy kits furnished by Technical Sales Corporation. Wet well inlets or"hubs" can be field <br /> fabricated with short pieces of PVC pipe, pipe coupling or a bell end of gasket joint PVC pipe. Turn the <br /> gasket joint"up stream" to make it a flexible connection. Cut a reasonable round hole, insert pipe into wet <br /> well, and "mud and wipe"the joint- both inside & outside with the epoxy that is furnished. Material will set up <br /> in 15 minutes and form a watertight seal equal in strength to the wet well and influent pipe. Epoxy kits allow <br /> all inlets to be field fabricated and installed for the specific job conditions. <br /> F/FS/TSCV/LF/Wetwell 48-60-72 <br /> Pg 1 of 2,Rev 2005 <br />