My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22387
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2021 8:25:46 AM
Creation date
3/29/2021 1:33:13 PM
Metadata
Fields
Template:
Building Department
Company Name
HIDDEN RIVER
Building Department - Doc Type
Permit
Permit #
20-22387
Building Department - Name
HIDDEN RIVR HO ASSOC INC
Address
39805 HARVEST CREEK LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OFFICEANAREHOUSE: <br /> 4621 N. HALE AVE <br /> TAMPA, FL 33614 <br /> TECH-mNl k ALES (813, 876-9256 <br /> C O R P O R A T 1 O IV FAX (813) 874-1194 <br /> Representing Innovative Manufacturers <br /> SUBMITTAL DATA <br /> TSC PRE-FAB PUMP SOLUTIONS@ PACKAGE DUPLEX SEWAGE PUMP STATION <br /> 48"x 11.76 FT DEEP H-20 RATED FIBERGLASS MONOLITHIC WETWELL <br /> WITH FULL FIBERGLASS BOTTOM and ANTI-FLOAT FLANGE—MEETS ASTM D 3753 <br /> SEWAGE PUMPS, PANEL,WETWELL,VALVE BOX AND PIPING MEETS <br /> OR EXCEEDS REQUIREMENTS OF F.D.E.P. <br /> FOR PRIVATELY OWNED&MAINTAINED PUMP STATIONS <br /> JOB: HIDDEN RIVER STATION#4 THIS DOCUMENT HAS BEEN CHECKED FOR GENERAL DESIGN, <br /> CONSTRUCTION,SIZE AND CONFORMITY TO CONTRACT <br /> DOCUMENTS.CONTRACTOR SHALL VERIFY ALL DIMENSIONS, <br /> LOCATION: ZEPHYRHILLS QUANTITIES AND CAPACITIES.APPROVAL DOES NOT RELIEVE <br /> THE CONTRACTOR FOR COMPLIANCE WITH THE CONTRACT <br /> DOCUMENTS. <br /> ENGINEER: Hamilton C7NO EXCEPTION TAKEN <br /> ❑MAKE CORRECTIONS NOTED <br /> CUSTOMER: BURGESS CIVIL REJECTED/RESUBMIT <br /> HAMILTON ENGINEERING&SURVEYING,DC- <br /> DATE: FEBRUARY 14,2019 <br /> DATE. Mar 04,2019 BY- <br /> ELECTRICAL SERVICE:208-230 VOLT,THREE PHASE VERIFY <br /> NEC CODE REQUIRES SEPERATE NEUTRAL&GROUND WIRES <br /> 60 AMP(THREE PHASE) SERVICE REQUIRED TO PANEL(MINIMUM) <br /> PUMP MODEL: EBARA SEWAGE PUMPS <br /> MODEL 100DLFU62.22[3 HP]MOTOR <br /> DESIGN FLOW: 142 GPM @ 25 FT/TDH <br /> kr ❑ <br /> .s <br /> %; Al <br /> I <br /> se <br /> EBARA INTERNATIONAL <br /> CORPORATION <br /> F/FS/Subm ittal/48PreFabGR <br />
The URL can be used to link to this page
Your browser does not support the video tag.