Laserfiche WebLink
P <br /> N®va , . NovaCHARGE Purchase Order <br /> mpwrermg he afore <br /> 4201 Vineland Road <br /> Suite i-5 Date P.O. No. <br /> Orlando,FL 32811 1/22/2020 P0200020 <br /> Vendor Ship To <br /> Accurate Electrical Connection,Inc NovaCharge <br /> 3434 N.Orange Blossom Trail 4201 Vineland Road <br /> Orlando,F132804 Suite i-5 <br /> Orlando.FL 32811 <br /> Project Account# Partner/Reseller ORG Name or Number <br /> Zephyrhills DCFC ZephyrhDEF177 <br /> Item&Mode... Description. Qty U/M Rate MPN Amount . <br /> Installation Ch... Installation of two DCFC: 1 ea 16,684.40 16,684.40 <br /> Provide material and labor to install(1)600 <br /> amp three phase 120/208v Nema 3R 25,000 <br /> KA service rated switchgear with(2)200 amp <br /> and(2)40 amp circuit breakers with a 600 amp <br /> Main breaker to supply power to(2)200 amp <br /> 280v quick charging station and(1)class II <br /> dual charging station per site walk.Provide <br /> material and labor to install approximately <br /> (85'x2)Of 2"directional bore underground <br /> PVC raceway with(3)3/0 THHN copper and <br /> #6 Grounding conductors from new 600 amp <br /> service located in lift station fenced in <br /> compound per site walk.Provide material and <br /> labor to install approximately(100')Of 1" <br /> directional bore PVC raceway with 4-##8 a <br /> THHN and a#10 THHN grounding copper <br /> conductors from new panel to new dual <br /> charging station location per site walk.Provide <br /> material and labor to install(2)32"x32"x6" <br /> concrete base for quick charge units.Provide <br /> material and labor to install(1) 16"x16" <br /> concrete base for class II dual charging station. <br /> Provide material and labor to install(3)3 inch <br /> bollards at charging station location.Provide <br /> underground locates to complete project. <br /> Provide labor and material to replace(1) <br /> existing car charging station off existing 40 <br /> amp 208 V circuit per site walk.Provide <br /> electrical permit to complete project.This bid <br /> has been based on all copper wiring to <br /> complete project.All work to be completed <br /> during normal business hours(7am-3:30pm). <br /> Installation of Four signs. <br /> Total S16,694.40 <br />