My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22462
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 2:15:18 PM
Creation date
3/29/2021 2:15:17 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
20-22462
Building Department - Name
PAINTER,JERRY L & JEAN
Address
3410 MALACHITE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Procedure for Lot improvement Requests <br /> (Please refer to the"Rules and Regulations") Permit <br /> All lot improvement requests must be submitted no later than Wednesday by 2_00 to <br /> be processed on the following committee meeting day. <br /> LAII requests are to be submitted in the Emerald pointe office or Chairman of the Lot improvement <br /> Committee.The Chairman or committee member will review the request,visit the site if necessary to <br /> clarify improvements and will present it to the Lot Improvement Committee for their review on a <br /> weekly basis. <br /> 2.Any request which Is NOT filled out:properly,will be returned to the applicant without an action being <br /> taken. <br /> 3.After the Committee has recommended approval or denial of the request,it will be presented to the Board of <br /> Directors for their approval or denial.Board will meet once a week for the lot improvement applications. <br /> 4.There will be NO one day approvals or last minute approvals.Request may take 7 to 14 days for <br /> appropriate review and consideration,(if necessary)thus giving the Committee and Board members time to <br /> review and consider the request in a thorough manner. <br /> 5.The original request will be dated and signed as approved or denied,and after being copied the original will <br /> go into to the members file and the copy returned to the Lot owner by the Board of Director liaison or the <br /> Chairman of the committee. <br /> 6.The committee will follow up on requests to determine that the request as presented and approved is being <br /> adhered to. <br /> 7.Any permit will be ACCEPTED FOR APPROVAL between October 15 and March 31 of each year,however, <br /> each owner music understand and know there must be enough members of the Committee to review and <br /> recommend to the Board for their approval. <br /> 8.Any changes made on a previously approved project must be resubmitted before beginning the <br /> changes.Amended permit will be issued at the time of approval. <br /> 9.11:is recommended that property owners of major improvements or new construction projects request <br /> an appointment with the lot improvement committee to review plans and answer any questions that <br /> may arise. <br /> 10.All applications submitted must have locations of their cM well water shutoffs. <br /> As the owner of Lot# 1;�,01 ,1 understand the Lot improvement Committee and/or the Board of <br /> Directors will enter the property to follow the external progress of the construction or improvement as submitted <br /> on the Lot Improvement Request. <br /> ALL REQUESTS MUST COMPLY WITH CURRENT REQUIRED PERMITS FROM THE CITY <br /> OF ZEPHYREILILS, PASCO COUNTY, OR STATE OF FLORIDA CURRENT BUILDING <br /> CODES.All permits must: be 12osted visible to the street. <br /> _t <br /> Lot d6nees Signature ! bate <br /> 6' <br /> L,otimpReq-026-2019 <br /> Page 1.of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.