Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the-2016 N.E:C <br /> 24. In accordance with the Land Developmeht Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25;.R403.5.3Hot,w8ter pipe insulation <br /> Insulation for hot water pipe with'a minimum thermal resistance (R value) of.R-3 shall.be applied to the <br /> following: <br /> Piping./;inch (19.1 mm)and larger in.nominal diameter.: <br /> Piping:serving more than.one dwelling unit. <br /> Piping located outside the conditioned space <br /> Piping from the:water heater to a distribution manifold:. <br /> Piping:located under a floor slab.= <br /> Buried in piping, <br /> .'Supply and:return piping in recirculation-systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O: - <br /> 26.A copy of the energy cacls shall be with permit at all times <br /> 27.. Copy of final insulation retiort-shall be provided ivith permit before fnaL <br /> 28.No fence.Pool or screen'enclosure -is issued witkthis permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />