Laserfiche WebLink
'23. Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at-least-10 <br /> feet around the structure. <br /> 25; R403.5.3Hof Water.pipe insulation <br /> insulation for hot water'pipe with a minimum thermal resistance(R-value) of-R-3 shall be applied to the <br /> following: <br /> Piping 3/; inch (19.1 mm)and larger in nominal diameter., <br /> Piping,serving more than:one dwelling unit. <br /> Piping located outside the conditioned space;.. <br /> Piping from the water heater to:a distribution manifold., <br /> Piping located under a floor slab. <br /> Buried in piping.. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blower door test shall be provided before C.O. <br /> .26. A copy of the energy.cacls shall be with permit at all times: <br /> 27. Copy of finial insulation report shall be provided ivith permit before flnaL <br /> 28.1 No fence, pool or-screen enclosure :is issued with:this yerinit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />