Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water'pipe insulation. . <br /> Insulation for hot water pipe Withh-a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping-1;inch (19.1 mm) and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:.water'heaterto a distribution manifold., <br /> Piping.located under a floor slab. <br /> .BLried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided.before C.O: <br /> 26.A cony of the-energy cacls shall be with permit at all times <br /> 27. Conti of final in reoort-shall be provided with permit before fnaL <br /> 28. No,fence,pool or screen enclosure -is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code.6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />