Laserfiche WebLink
i <br /> Envelope Leakage Test Report (Blower Door Test) <br /> Residential Prescriptive, Performance or ERI Method Compliance <br /> 2017 Florida Building Code, Energy Conservation, 6th Edition <br /> FJurisdiction: Permit#: <br /> Job Informatiion <br /> i <br /> Builder: Mario's Air Conditioning and 1-10diftiUmity: !LOU NA <br /> Address: 6426 Bradford Woods Drive <br /> City: Zephryhills State: FL Zip: 33542 <br /> Air Leakage Test Results -Passing results must n*ef`either the Performance,,Pi-escr giie, or:ERI'Method ; <br /> PRESCRIPTIVE METHOD-The building or dwelling unitshall be.tested and verified as;having an air 11. eakage rate of not exceeding 7 air <br /> . <br /> changes per flour at a pressure of0.2 inch w.g:;(50 Pascals)in Clirnate Zones.1 and 2. <br /> 0 PERFORMANCE or ERI METHOD-The building or dwielling unit`shall be tested and verified as having 66;air leakage rate of not exceeding <br /> the,selected ACH(50)value,as shown on Form R405-2017(Performance),oi R406-2017"(ERI ,,section labeled;as infiltration;sub-section ACH50.` <br /> ,ACH(50)specifred'o'_Form R405-2017-Energy Caic(Peifonnance)or R406-201 T,,(ER 7.000 <br /> x 60 _ 17390 = Method for calculating building volume: <br /> CFM(50) Building Volume ACH(50) O Retrieved from architectural plans <br /> F-1 PASS •Code Is calculated <br /> When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated <br /> must be verified by building department. <br /> R402.4.1.2 Testing.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.(50 Pascals). <br /> Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7),Florida Statues.or individuals licensed as set forth in Section <br /> 489.105(3)(f),(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and <br /> provided tothecode official.Testing shall be performed at anytime after creation of all penetrations of the buildingthermalenvelope. <br /> During testing: <br /> 1.Exteriorwindows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended we or other infiltration <br /> control measures. <br /> 2.Dampers including exhaust,intake,makeup air,back draft and flue dampers shall be closed,but not sealed beyond intended infiltration control <br /> measures. <br /> 3.Interior doors,if installed at the time of the test,shall be open. <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off. <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. <br /> Testing.Company, <br /> Company Name: Phone: <br /> I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code <br /> Energy Conservation requirements according to the compliance method selected above. <br /> I <br /> Signature of Tester: Date of Test: <br /> I <br /> i <br /> Printed Name of Tester: <br /> License/Certification#: Issuing Authority: <br /> I <br /> 12/9/20191:37:05 PM EnergyGaugeO USA 6.0.04(Rev.1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1 <br /> 1 <br />