My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-21328
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-21328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 1:38:46 PM
Creation date
5/12/2021 11:38:40 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-21328
Building Department - Name
CROWN CASTLE GT COMPANY LLC
Address
38522 A AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 26, 2019 <br /> 287.667 Ft Self Support Tower Structural Analysis CC/BU No 816298 <br /> Project Number.9800.816298,Phase 4, Order 485277,Revision 1 Page 5 <br /> 3.1) Analysis Method <br /> tnxTower(version 8.0.5,0), a commercially available analysis software package, was used to create a' <br /> three-dimensional model of the tower and calculate member stresses for various loading cases. <br /> Selected output from the analysis is included in Appendix A. <br /> 3.2) Assumptions <br /> 1) Tower and structures were built and maintained in accordance with the manufacturer's <br /> specifications. <br /> 2) The configuration of antennas, transmission cables, mounts and other appurtenances are as <br /> specified in Tables 1 and 2 and the referenced drawings. <br /> 3) Tectonic did not analyze the antenna supporting mounts as a part of this:analysis report and. <br /> assumed they are structurally sufficient. It is the carrier's responsibility to- ensure structural <br /> compliance of their existing and/or proposed antenna Supporting Mounts. <br /> 4) Dowel capacity governs reinforced foundation. Proposed reinforcement dowel capacity based <br /> on the previous analysis report by Tower Engineering Professionals, Inc. The dowel capacity for <br /> the previous reinforcement by IETS Engineering Services, P.C. is assumed to be governed by <br /> the steel capacity. <br /> 5) The existing tower geometry is based on the previous analysis report by Tower Engineering <br /> Professionals, Inc. referenced above. <br /> 6) This analysis is based on the tower mapping reports referenced above. Therefore, the material' <br /> grades are assumed as follows: <br /> Tower: Legs: A572-50 <br /> Bracing:A36 <br /> Anchor Rods: A36 <br /> Foundation: Concrete: 3000 psi <br /> Steel Reinforcement: Grade 40 ksi <br /> These assumptions are consistent with the previous analysis report by Tower Engineering <br /> Professionals, Inc., referenced above. <br /> This analysis may be affected if any assumptions are not valid or have been made in error. Tectonic <br /> should be notified to determine the effect on the structural integrity of the tower. <br /> 4)ANALYSIS RESULTS <br /> Table 4-Section Capacity(Summary) <br /> Section Component Critical SF*P_allow % <br /> Elevation(ft) Size P(K) Pass/Fail <br /> No. Type Element Capacity <br /> .. <br /> T1 ^22 06084 Leg I L5x5x5/16 I 3 - -0.918 I 92178 I 1.0 I Pass <br /> T2 2 0.085 Leg L5x5x5/16 . 25 2.356 92.178 4 2.6b).] Pass <br /> T3 272.5 Leg L5x5xl/2 F46 -13.362 184.6361 7.2 Pass <br /> 247.333 8.0(b) <br /> T4 247.333- Leg L8x8x5/8 114 -31.544 434.867 7.3 Pass <br /> 232.583 <br /> T5 232. - Leg L8x8x5/8 152 -39.611 469.785 8'4 <br /> 222.166 8.9(b) <br /> Pass <br /> 16 � <br /> T6 2 2.166-583 Leg L8x8x5/8 189 -51.729 453.830 11.4 Pass <br /> T7 209.583-197 Leg L8x8x5/8 226 -70.444 453.830 15.5 Pass <br /> 15.8(b) <br /> T8 197-181.3 Leg L8x8xl 1/8 265 -93.730 736.067 12.7 T Pass <br /> T9 181.3- Leg L8x8x1 1/8 302 -126.871 814.224 15.6 Pass . <br /> 170.833 27.9(b) <br /> tnxTower Report-version 8.0.5.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.