My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22438
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 11:50:56 AM
Creation date
5/12/2021 11:50:55 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
20-22438
Building Department - Name
CITY OF ZEPHYRHILLS LS #6
Address
5335 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3 Change orders shall be based upon the mutual agreement between the City <br /> I <br /> and the Contractor and shall be performed under applicable provisions of the Contract <br /> Documents. The Contractor shall proceed promptly, unless otherwise provided in the <br /> change order. <br /> 5.4 The Contractor shall be responsible for the cost ofl any change order, the <br /> necessity for which was caused or created by the actions or inactions of Contractor, its <br /> employees or assigns, not contemplated under this agreement. <br /> ARTICLE V1. CORRECTION OF WORK <br /> 6.1 The Contractor shall promptly correct work rejected by the City or known by <br /> the Contractor to be defective or failing to conform to the requirements of the Contract <br /> Documents, whether observed before or after substantial completion, and whether or not <br /> fabricated, installed or completed. The Contractor shall bear costs of correcting such <br /> rejected work, including additional testing and inspections. <br /> 6.2 If, within one (1) year after the date of substantial completion of the work or <br /> after the dated for commencement of warranties established in a written agreement <br /> between the parties, or by terms of an applicable special warranty required by the <br /> Contract Document, any of the work is found to be not in I accordance with the <br /> requirements of the Contract Documents, the Contractor shall correct it promptly after <br /> receipt of a written notice from the City to do so, unless the City has previously given the <br /> Contractor a written acceptance of such condition. <br /> 6.3 Nothing contained herein shall be construed to establish a period of <br /> limitation with respect to other obligations which the Contractor 'might have under the <br /> Contract Documents. Establishment of the time period of one (1) year, as described <br /> above, relates only to the specific obligation of the Contractor to],correct the work, and <br /> has no relationship to the time within which the obligation to comply with the Contract <br /> Documents may be sought to be enforced, nor to the time within which proceedings may <br /> be commenced to establish the Contractor's liability with respect to his obligations other <br /> than specifically to correct the work. <br /> ARTICLE V11. CLAIMS AND DISPUTES <br /> 7.1 With regard to any material disputes between the City and Contractor <br /> (including change orders) regarding the construction of U.S. Highway 301 frontage road, <br /> City and Contractor agree to cooperate in good faith to resolve all! disputes promptly. If <br /> City and Contractor are unable to resolve a dispute within 14 days of written notice from <br /> one party to the other that a dispute exists, City and Contractor agree to mediate the <br /> dispute with a mutually agreed upon mediator chosen from a list,of certified mediators <br /> maintained by the court having jurisdiction over the dispute. City and Contractor shall <br /> share the costs of the mediator. In the event of a claim, dispute or other issue not resolved <br /> through mediation, City or Contractor may institute litigation to resolve the matter, in which <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.