Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016,N.E.0 <br /> .24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5,3Hot water pipe insulation <br /> Insulation for hot water. pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 34 inch (19.1 mm) and larger in.-nominal diameter._ <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold:, <br /> Piping located under,a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A copy of the enemy:cacls shall be with permit at all times. <br /> 27. COpy of rinal insulation report shall be provided with permit before fnaL <br /> 28. No fence,pool or screen enclosure :is issued with ahis permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />