Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 of the.2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded,before final at least 10 <br /> feet-around the structure. <br /> 25. R403.5.Mof water.pipe insulation. <br /> Insulation for hot water pipe-with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V.inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditionod space. <br /> Piping from the water'heater to a distribution manifold., <br /> Piping:located under a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Slower door test shall be provided before C.O. <br /> 26.A cony of the energy cacls shall be with permit at all times <br /> 27.. Cop of final.insulation-report shall be provided with permit before FnaL <br /> 28:No fence,pool onscreen'enclosure .is issued with:this permit <br /> - F.F.E.-Finished Floor Elevation <br /> F.B.C-.Florida Building Code-6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />