Laserfiche WebLink
` I <br /> 23. Tamier- Resistant.Receptacles in accordance with 406.11 of the 20161N.E:C <br /> 24. In accordance with the Land Develop_merit Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot.water pipe insulation <br /> Insulation for hot.water pipe Withh-a minimum thermal resistance (R-value) of.R-3 shall be applied to the <br /> following*:' <br /> Piping�1.inch (19.1 mm)and larger in:nominal diameter.. <br /> Piping.serving more than one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Pipingf theer heater to.a'distribution manifoldmwa , <br /> Piping.located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the' energy cacls shall be with permit at all times <br /> 27. Copu of Thal insulation report shall be provided with permit before linab <br /> 28. No fence,pool or enclosure :is issued with:this-permit <br /> T.F.E.-Finished Floor Elevation <br /> F.B.C-:Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br /> 1 <br />