Laserfiche WebLink
i <br /> 21 Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10. <br /> feet around the structure. <br /> 25..R403.5.3Hot water pipe insulation <br /> Insulation for bot water pipe with'a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping Si; inch (19.1 mm) and larger in nominal diameter., <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space... <br /> Piping from the:water heater to:a distribution manifold,, <br /> Piping.located under a floor slab. <br /> Buried in piping.. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower:door test shall be provided before C.O. <br /> 26.A cony of the enerey:cacls shall be with permit at all times <br /> 27. Cony of final'insulation reoort shall be orovided ivith permit before rnah <br /> 28. No fence,pool or screen enclosarejs issued with:this-permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />