Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the.2016 N.E.-C . <br /> 24. In accordance with the Land Development Code,lots..shall.be sodded before final at least 10. <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulatioii•for hot.water. pipe with'a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> followin <br /> wing:": <br /> Piping 3h inch (19.1 mm) and larger in:nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold., <br /> Piping located under a floor slab. <br /> Buried in piping.: <br /> 'Supply and return piping in recirculation'systems other than demand recirculation systems; <br /> 25: Blower.door test shall be provided before C.O: <br /> 26.A copy of the energy ea&shall be-with,permit at all times <br /> 27. Copy of final insulation report-shall be provided with permit before fnaL <br /> 28. Xo fence, pool or screen enclosure :is issued with:thispermit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-:Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />