Laserfiche WebLink
23,Tamper-Resistant.Receptacles in accordance with 406.41 of the 2016 N'E.0 <br /> 24. In accordance with the.Land Development Code,lots-.shall.be sodded before final at least 10 <br /> feet around the structure. . <br /> 25.. R403.5.3Hot.water.pipe.insulation. <br /> Insulation for hot,water pipe_with-a minimum thermal-resistance (R-value) of R-3 shall be applied to the <br /> following:. . <br /> Piping.3/<inch (19.1 mm) and larger in:nominal diameter. <br /> Piping.serving more-than one dwelling unit: <br /> Piping located outside the conditioned space: <br /> Piping from the:vuater heater to a distribution manifold: . <br /> Piping.located under a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided.before C.O.. <br /> 26.A copy of the energy cacls shall be with permit at all nines: - <br /> 27 Conn offinahinsulation report shall be nrouided with nermit'before rinaL <br /> 28,No fence, pool onscreen enclosure :is issued with:this permit.- <br /> F.F.E.-Finished Floor Elevation <br /> F.B.0 Florida Building Code 6t'Edition <br /> R.O.W.'-Right of Way <br /> A.D.A.'-Americans with Disabilities Act N.E.C.-National Electric,Code(2016) <br /> i <br />