Laserfiche WebLink
i <br /> i <br /> . ERICAN VISA• <br /> EXPRES <br /> Ryman Roofing, Inc. <br /> 5%fee for credit card processing. <br /> A Division ofRymon Construction,Inc. <br /> 36413 SR 54 • Zephyrhills, Florida 33541 Proposal# <br /> Phone(813) 782-6094 • Fax(813)788-6773 NO. <br /> 1-855-Go-Ryman (1-855-467-9626) • Lic.#CCC 1325505 Estimate# 002800 <br /> www.RymanRoofing.com ,I <br /> Serving all of Central Florida Job# <br /> Owner/Purchaser.Mike-Walls <br /> Claim#: Insurance Company: <br /> Policy# <br /> Job Address: 6638 Foxmoor Dr City. Zephyrhills Zip: 33542 <br /> Mail to Address: E-Mail Address: mike8073@_yahoo.com <br /> Home #- 813-602-4489 Cell #: Business #: <br /> 0✓ Complete tear off of existing Asphalt shingles Additional Notes/SpecialConcerns: Includes <br /> One laver included Install new GAF 30 year lifetime Ltd. dimensional <br /> F✓ Secure all loose roof decking as needed according shingles <br /> to Florida Building Codes <br /> Roof dried in with Synthetic <br /> Rhino roof synthetic underlayment <br /> 0✓ Install new valley metal with galvanized metal <br /> Z✓ Install new 6 "drip edge color: White Resisto peel and stick in dead valleys <br /> F✓ Install new lead boots <br /> Q✓ Install all new general roof vents <br /> M Install new Shingle Metal Tile Install two 4' off ridge vents <br /> Modified Butimen FITPO <br /> 0 Manufacturer (shingle, metal or tile) GAF Two sheets of plywood included <br /> Manufacturer (TPo or Mod. Bitumen) <br /> Q✓ Color:(Shingle,MetalorTile) Permit and scheduling of inspections <br /> Color:(TPOorMOD.Bitumen) <br /> F7 All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet <br /> 0✓ All materials, labor and permits furnished Base Pride"$ �,874.�� <br /> F71 Provide a 5 year labor warranty <br /> Additional Items: <br /> Payment Method: Check# 2530 Cash Financing 1-1 Insurance Claim <br /> ❑ Credit Card# Exp. Date CC ID# <br /> Down Payment:$ 3500 Amount Financed:$ Approx.lMonthly Payment: $ <br /> PaymentTerms: 35% down and balance upon completion <br /> Extras: <br /> *Base Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"abov . .,�G <br /> Deficient 1/2"plywood replaced at a cost of$ 85.00 per sheet in the roof field,which includes labor&materials.All other wood work/ad- <br /> ltional labor,such as, but not limited to,valley rebuilding, rafter replacement, 1x decking,etc.will be a rate of$5.00 per lineal foot plus the <br /> cost of materials. <br /> THIS BECOMES A BINDING CONTRACT UPON ACCEPTANCE OF PROPOSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> I ACCEPT THIS PRPPMIL40 HEREBY CERTIF HAT I HAVE READ AND FULLY UNDERSTAND THE PROVISIONS OF THIS CONTRACT. <br /> Purchaser: Date: 2/7/20I <br /> Purchaser: Estimator: Ed <br />