NOTICE OF,DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions'
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. if the
<br /> contractor is not licensed as required by law,both the owner and contractor may be cited for a misdemeanor violation
<br /> under state law. if the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractors) sign
<br /> portions of the"contractor Block"of this application for which they will be responsible. if you,as the owner sign as the
<br /> contractor,that may be an indication that he is not properly licensed and Is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
<br /> use in existing buildings, or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate of occupancy"or final power release. if the project does not involve a certificate of occupancy or
<br /> final power release,the fees must be paid prior to permit issuance. Furthermore,if Pasco County Water/Sewer Impact
<br /> fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LiEN LAW(Chapter 713,Florida Statutes,as amended): if valuation of work Is$2,500.00 or more,I
<br /> certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> Southwest Florida Water Management District-Wells, Cypress` Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways.
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone"V'unless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction,I certify that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> _properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application,for lots less than one(1)
<br /> acre which are elevated by fill,an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER,i promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. 1 understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or
<br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued.shali become invalid
<br /> unles3 the work authorized by such permit is commenced within six months of permit issuance,or if.work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
<br /> may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate
<br /> justifiable cause for the extension, if work ceases for ninety(90)consecutive days,the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS T OUR PROPERTY. IF YOU INTE D TO OBTAIN NANCING,CONSULT
<br /> WITH YOUR LENDER A A N EFORE RECORDING YOUR N E OF COM EMENT.
<br /> FLORIDA JURAT(F.S.1 )
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed d a t or ffl eci befo a this Subscribed and sw ^-^�^^va � e this
<br /> 1_3I DIrL)YL '- ,mob �p���/ �►FUt.��-
<br /> o is'a rsana ty nown r h s/trave produced ho is s ersonau x ftfm'd or rdas/have produced
<br /> as identification. as identification.
<br /> c �a�
<br /> G�Notary Public L - ._ G 1 Notary Public
<br /> mission No. Comm on No. O
<br /> A.CAMPBELL
<br /> Name of Note t{if 4r st fWdPdbliC-State of florlda Name of Notary typed,p te{i. ysfa**d
<br /> 2• 4 C
<br /> • r� '•= Commission#GG 112939 ;2oF „o: Notary Public-State of Florida
<br /> My Comm.Expires Jul 19,2021 ;�'• Commission#GG 112939
<br /> Bonded through National Notary Asm • per; My Comm.Expires Jul19,2021
<br /> �OFW, Bonded through National Notary Assn.