PGT Industries,Inc.
<br /> NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br /> A. DRAWINGS
<br /> 1. Manufacturer's die drawings and sections.
<br /> (Submitted under NOA No. 14-0930.25)
<br /> 2. Drawing No. MD-5520.0 titled"Vinyl Fixed Window NOA (LM&SM)", sheets 1
<br /> through 11 of 11, dated 09/09/14, with revision B dated 06/06/17,prepared by
<br /> manufacturer, signed and sealed by Anthony Lynn Miller,P.E:
<br /> B. TESTS
<br /> 1. Test reports on: 1)Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
<br /> 2)Large Missile Impact Test per FBC,TAS 201.-94
<br /> 3) Cyclic Wind Pressure Loading per FBC, TAS 203-94
<br /> along with marked-up drawings and installation diagram of a PVC sliding glass door,
<br /> a PVC fixed window and an aluminum sliding glass door, using: Kodispace 4SG TPS
<br /> spacer system, Durasealo spacer system, Super Spacer'NXTTM spacer system and XL
<br /> EdgeTm spacer system at insulated glass,prepared by Fenestration Testing Laboratory,
<br /> Inc., Test Reports No. FTL-8717, FTL-8968 and FTL-8970, dated 11/16/15,
<br /> 06/07/16 and 06/02/16 respectively, all signed and sealed by Idalmis Ortega,P.E.
<br /> (Submitted under previous NOA No. 1 6-0629.12)
<br /> 2. Test reports on: 1)Air Infiltration Test,per FBC, TAS 202-94
<br /> 2)Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
<br /> 3) Water Resistance Test,per FBC,TAS 202-94
<br /> 4)Large Missile Impact Test per FBC, TAS 201-94
<br /> 5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
<br /> 6)Forced Entry Test,per FBC 2411.3.2.1, and TAS 202-94
<br /> along with marked-up drawings and installation diagram of a PVC fixed window,
<br /> prepared by Fenestration Testing Laboratory, Inc., Test Report No. FTL-7897, dated
<br /> 08/01/14, signed and sealed by Idalmis Ortega,P.E.
<br /> (Submitted under NOA No. 14-0930.25)
<br /> C. CALCULATIONS
<br /> 1. Anchor verification calculations and structural analysis, complying with FBC-5tb
<br /> Edition (2014), dated 09/18/14 and 04/07/15,prepared by manufacturer,signed and
<br /> sealed by Anthony Lynn Miller,P.E.
<br /> (Submitted under NOA No. 14-0930.25)
<br /> 2. Glazing complies with ASTM E1300-09
<br /> D. QUALITY ASSURANCE
<br /> 1. Miami-Dade Department of Regulatory and Economic Resources (RER).
<br /> �J�LLJQ 94_0,-�-
<br /> Manuel P ez, .E.
<br /> Product Control xa iner
<br /> NOA No.1 - 614.09
<br /> Expiration Date: April 30,2020
<br /> Approval Date: October 26,2017
<br /> l -1
<br />
|