My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22532
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 1:40:31 PM
Creation date
5/12/2021 1:45:57 PM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
20-22532
Building Department - Name
MOONEY,DERKAOUI TARA ELAM
Address
6416 COBBLE BLISS ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ! a <br /> ROCK-IT SYSTert"l 4.Q iI'1STEILL <br /> i <br /> ti <br /> -.Xn <br /> 1 <br /> r q R&A <br /> Instal)EcoFasten Solar Flashing with-Rock-It Mounts <br /> •Follow EcoFasten Solar Install instructions forflashing and bracket Install(GreenFasten shown above). <br /> •Optimum vertical distance behveen lag bolts is 1 3/8',plus module dimension. <br /> •Set mounts oneavemostrowsothat the Rock-it Pedestal Is ontheSouthendofRock-itSilde. <br /> •Set mounts on all upper rows sothatthe Rodk4t:Pedestal Is on the North end of Rodk4t Slide. <br /> 2 Install Rock-It Array Skirt onto Eave Mounts <br /> • Slide Rock-it Array Skirt Into front channel on Rock-It Shelf. <br /> •.Array Skirt End Caps are pre-Installed on the East end of each skirt'section,and are used t -couple.the skirt sections where needed{see Fig.A}. <br /> Tighten Mid-Clamp bolt,damping Rock-lt Array Skirt to mount:Torque to 200 inabs:(1301n-lbs.when Installing with 32mm modules). <br /> _4 Instail Rock-it Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot Is required) <br /> • Prior to mounting on the roof,snap Load Bearing Foot into the bottom of.Rockdt Coupling if required._ <br /> (Each Load Bearing Foot Is set to same height as the Rock-it Mounts-ad)ust accordingly)-. <br /> On eave row only,slide Rock-it Array Skirt onto Rock-It Coupling SheltTorque to specified value, <br /> • NOTE.If a coupling lands on a rafter,the Hybrid Mount!should be used In place ofthe Rock-It Coupling(refer to image.3a). <br /> *Hybrid Mount can be made in the.fleld by assembling a coupling to a mount pedestal;or by purchasing separately. <br /> 5Align and Straighten'First Row of the Rock-it System with Rock-It Array Skirt <br /> •Use North-Southadjustmerit ofthe Rock4t Pedestal to straighten Rock4t Array Skirt and allgn module with ArraySIdrL <br /> •Torque screwon side ofRock-it Pedestal to'150lndbsto secure ttto the RockdtSlide. <br /> •Adjust Flange Level Nut to level the system(optional—can be leveled during orafterinstaliaUon}• i <br /> 6_9 Install 1 St Row of.PV Modules. <br /> •Slide upslope Rock-it Mounts down to engage top offirst module. <br /> •install Rock-it Couplings on the upslopestdeof 1st row of paneis. <br /> -Torque 2nd row of Mid-Clamps on Rock-@ Mounts and Rock-it Couplings to specified value. <br /> •Install balance ofPV modules,ensurin g that the Rock4t Pedestals aye In the appropriate position,then torci ue Mid-Clamps to secure modules. <br /> 1-0 Level the Rock-it System <br /> -when assemblyls complete;ievel the entire system byadjusting-Flange Level Nuts(Flange Level Nuts have no torque value). <br /> • Height between roofsurface and underside of modules should be 3"or less,when Installed with Type 2 modules <br /> INSTALLATION NOTE:Modules should.be Installed so that the Junction box is Installed upslope,away.from the leading edge of the array. <br /> www.ecofastensolarcom info@ecofastensolaccom 877=859-3947 5 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.