My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22534
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 1:48:35 PM
Creation date
5/12/2021 1:48:33 PM
Metadata
Fields
Template:
Building Department
Company Name
HIDDEN RIVER
Building Department - Doc Type
Permit
Permit #
20-22534
Building Department - Name
LENNAR HOMES LLC
Address
39871 HARVEST CREEK LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOF JOIST (TYP.) ROOF PANEL <br /> CEILING INSULATION (SEE SHEET 11) (SEE SHEET 11) <br /> (TYP., SEE SHEET 11 <br /> ) 16 END FRAMEgo <br /> COVE w <br /> ' HEADER (TYP., <br /> SEE SHEET 11 \ F�e o <br /> w <br /> 0 Po <br /> DRYWALL TYP., END FRAME HEADER CEILING INSULATIONRej 0Iy_ <br /> SEE SHEET 8 - 6!t y��!11 9 <br /> (SEE SHEET 11) _ (SEE SHEET 11) _ @-z e5 , } <br /> - --- ------- -- -----FINISH-SCHEDULE)—-------- — --- -- - - --- -0� <br /> a <br /> WALL INSULATION ROOF JOIST 0 <br /> ®_ ROOF PANEL SEE SHEET 11 i 3 @ �i�i!V <br /> (TYP., SEE SHEET 8 — (SEE SHEET 11) ( ) <br /> WALL LEGEND) <br /> OUTER RAIL <br /> (SEE SHEET 11 <br /> EXTERIOR WALL PANEL <br /> (TYP., SEE SHEET 8 <br /> COVE BASE WALL LEGEND) LJ Z <br /> (SEE SHEET 8 - FLOORING ILL _O <br /> FINISH SCHEDULE) (SEE SHEET 8 - WALL INSULATION DRYWALL (n L` <br /> FlNISH SCHEDULE (TYP., SEE SHEET 8- _ F- O <br /> WALL LEGEND) FINISH SCHEDULE) Z Z U <br /> � W <br /> OUTER RAIL (TYP., p =O <br /> SEE SHEET 9) :� JQ <br /> (n <br /> EXTERIOR WALL PANEL Ld <br /> < Z U cf) <br /> (TYP., SEE SHEET 8 - J <br /> WALL LEGEND) p O <br /> FINISH COMMON FORK POCKET < 0 U <br /> FLOOR PAN FLOOR PAN (TYP., SEE SHEET 9) COVE BASE p <br /> (TYP., SEE SHEET 9) (TYP., SEE SHEET 9) (SEE SHEET 8 - Z _p 0 <br /> 7FLOORING <br /> FLOOR INSULATION FINISH SCHEDULE) (SEE SHEET 8 - 3 Z <br /> (TYP., SEE SHEET 9) FINISH SCHEDULE) - 0 <br /> o -I <br /> CROSS SECTION ANA 0 <br /> OUTER RAIL2 m <br /> (TYP., SEE SHEET 9) <br /> FLOOR PAN <br /> FLOOR INSULATION (SEE SHEET 9) 10 <br /> DFU 2 2 <br /> (TYP., SEE SHEET 9) i FU _o BwLO-1 <br /> SHEET <br /> CROSS SECTION B—B <br /> 1 � <br /> 8W OFFlCE L 678 <br />
The URL can be used to link to this page
Your browser does not support the video tag.