My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22538
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 1:42:09 PM
Creation date
5/12/2021 1:51:21 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-22538
Building Department - Name
WATKINS,RICHARD
Address
7135 ASHLAND DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:3690B31A-DC25-4648-BAAC-225959465045 <br /> Page 2 of 2 <br /> 2. The solar panels are 1Y2" thick. At no time will the panels be mounted higher;than 10" above the existing <br /> surface of the roof. <br /> 3. The following mounting types shall be used. Please refer to the mounting details for the associated required <br /> penetration depth. Based on our evaluation, the pullout demand is less than Ithe maximum allowable per. <br /> connection and therefore is adequate. <br /> • EcoFasten with Rock-It: (1) 5/16" lag screw. Pullout capacity based on National Design Specifications <br /> (NDS)of timber construction specifications for Southern Pine is 235 Ibs/inch penetration. <br /> • EcoFasten with Simple Grip: (2) OMG XHD #15 screws. Based on testing with 2" embedment, pullout <br /> capacity is 500 Ibs/mount. <br /> 4. Fasteners are installed to meet industry standards and this document satisfies requirements in 2017 FBC <br /> 2303.4.5 verifying that the fasteners will not adversely affect the roof framing. <br /> 5. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph B above, using the wind <br /> load uplift procedures of ASCE 7-10 and is specified below. These spacing requirements apply to all mount <br /> types indicated above. The following values have been verified by in-house testing and the mounting hardware <br /> manufacturers' data,which are available upon request. Panel support connection's should be staggered, where <br /> possible,to distribute load to adjacent members. <br /> Modules in Landscape Modules in Portrait <br /> Roof Zone Interior Ede Corner Interior Ede Corner <br /> Max Vertical Spacing in 40 40 40 66 66 66 <br /> Max Horizontal Spacing in 48 48 48 48 48 48 <br /> Max Uplift Load Ibs 332 266 246 560 448 415 <br /> D. Summary <br /> Based on the above evaluation,with appropriate panel anchors being utilized the roof system designed on will <br /> adequately support the additional loading imposed by the solar panels, if installed correctly. This evaluation has <br /> been performed for the structural elements only and verifies that they are in conformance with the 2017 Florida <br /> Building Code-Residential 6th Edition, current industry standards and practice, and the information supplied to us <br /> at the time of this report. <br /> If there are any questions regarding the above, or if more information is required, please contact me. <br /> Regards, <br /> J. Matthew Walsh, PE ��� �`,-- ?cE�SF' <br /> FL License No. 84923 S <br /> N 84 y <br /> p', ;[V <br /> DocuSigned by: STATE OF <br /> LORID <br /> 7AEEB20514FE4D2... ®0N A L <br /> Matthew Walsh <br /> February 19, 2020 3:18 PM MST j 02/18/2020 <br /> This item has been electronically signed <br /> and sealed by Matt Walsh using a Digital <br /> Signature and date. Printed copies of this <br /> document are not considered signed and <br /> sealed and the signature must be verified <br /> on any electronic copies. <br /> vivint. r <br />
The URL can be used to link to this page
Your browser does not support the video tag.