Laserfiche WebLink
' 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Develop_merit Code,lots shall.be sodded before final at least.10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot.Water pipe With a"minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31.inch (19.1 mm) and larger in.nominal diameter: <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the Water heater to.a-distribution manifold.. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A cony ofthe-enemy cacls shall be with permit at all times <br /> 27.. Cony of final insulation report shall be provided with permit before fnai' <br /> 28. No fence,pool or screen'enclosure :is issued with:thispermit: <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W-Right of Way- <br /> A.D.A.-Americans with Disabilities Act , N.E.C.-National Electric Code(2016) <br />